×

System and method employing a digital computer for automatically synchronizing a gas turbine or other electric power plant generator with a power system

  • US 4,536,126 A
  • Filed: 07/31/1972
  • Issued: 08/20/1985
  • Est. Priority Date: 12/18/1970
  • Status: Expired due to Term
First Claim
Patent Images

1. A system for operating an electric power plant comprising an electric generator, a prime mover for driving said generator, a circuit breaker for connecting the electric output of said generator to an external power system, a plant control system including means for controlling prime mover motive fluid flow, said control system including a digital control computer, means for determining a computer representation of the magnitude and rate of change of said generator output and the external system phase difference as a function of time, said control system providing a loop for controlling prime mover speed in response to a speed reference, means for operating said computer within said speed control loop at least to generate a representation of said speed reference at least during startup operations, means for operating said computer to modify said speed reference representation as a function of said phase difference representation, means for operating said computer to generate a breaker closure command when said phase difference representation reaches a predetermined condition, and means for operating said breaker in response to said closure command.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×