×

Power priority system

  • US 4,599,523 A
  • Filed: 02/16/1984
  • Issued: 07/08/1986
  • Est. Priority Date: 02/16/1984
  • Status: Expired due to Term
First Claim
Patent Images

1. A power control system, comprising;

  • first load means for performing a predefined function;

    second load means;

    power source means for powering the first and second load means; and

    power distribution means for selectively connecting and disconnecting the first load means and the power source means, and for selectively connecting and disconnecting the second load means and the power source means;

    the second load means including an energy storage means for storing power supplied by the power source means when the second load means is connected to the power source means;

    the second load means further including a control means for controlling the operation of the first load means, the control means powered by the power source means when the second load means is connected to the power source means and powered by the energy storage means when the second load means is disconnected from the power source means; and

    the power distribution means including means for comparing the voltage across the energy storage means with a predetermined reference voltage and switch means responsive thereto to connect the second load means to the power source means, so that the voltage powering the control means is maintained above a predetermined operating voltage.

View all claims
  • 13 Assignments
Timeline View
Assignment View
    ×
    ×