×

Electric power measurement system and hall effect based electric power meter for use therein

  • US 4,700,188 A
  • Filed: 01/29/1985
  • Issued: 10/13/1987
  • Est. Priority Date: 01/29/1985
  • Status: Expired due to Fees
First Claim
Patent Images

1. A system for measuring electrical power flowing through a power network to various loads and for detecting loss of power therefrom, the network having at least one power distribution line for feeding electrical power to a plurality of said loads through corresponding power lines, wherein each of said power lines is connected at one end thereof to an associated one of said loads and at the other end thereof to said distribution line, said system comprising:

  • a measurement meter situated on each of said power lines upstream of an associated load, wherein said measurement meter further includes means for measuring the instantaneous amount of electrical power consumed by the associated load, means for totalizing the instantaneous amount over a pre-defined period of time in order to generate a totalized value indicative of the amount of power consumed by the associated load throughout the pre-defined time period, and means for transmitting said totalized value over said network upon receipt of an appropriate instruction,a master meter situated on said distribution line, wherein said master meter further includes means for measuring the total amount of instantaneous electrical power flowing therethrough to all of the associated loads, means for providing a cumulative value indicative of the total amount of power consumed by all of said associated loads throughout said predefined time period, and means for transmitting said cumulative value over said network upon receipt of an appropriate instruction, andfirst processing means situated on said network for transmitting at least one of said instructions over said network to said measurement meter and for receiving the totalized value from each of said measurement meters, andsecond processing means situated on said network for transmitting other ones of said instructions and for receiving the cumulative value from said master meter,wherein either said first or second processing means further includes means for summing all the totalized values to form an aggregate value, and means for comparing the aggregate value against the cumulative value to determine any unusual discrepancies therebetween indicative of said loss.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×