×

Pressure-determined blowdown period for each of multiple, commonly manifolded curing presses

  • US 4,721,590 A
  • Filed: 07/24/1986
  • Issued: 01/26/1988
  • Est. Priority Date: 07/24/1986
  • Status: Expired due to Term
First Claim
Patent Images

1. In a curing room containing plural curing presses for tires, each of which presses is provided with an elastomeric curing bladder deployed within separable upper and lower mold halves, and a blowdown conduit through which a blowdown fluid is to be blown down from within said curing bladder, near the end of a curing cycle, into a common manifold which places two or more bladders in pressure-sensing, relationship with each other during a portion of the blowdown period, the improvement comprising,pressure transducer means distally located relative to said halves but in pressure sensing communication with the interior of said bladder so as to generate a first signal correlatable with an instantaneous pressure within said bladder during the blowdown period;

  • programmable controller means including(i) means for storing and executing a sequence of instructions determinative of fixed intervals of time for shaping said tire and thereafter curing it with a curing fluid at adequate temperature and sufficient pressure for the purpose;

    (ii) means for comparing said first signal generated during the blowdown period with a second signal corresponding to a preselected low pressure within the range from about 1 to about 10 psig; and

    ,(iii) means to actuate the separation of said halves when said first and second signals are matched; and

    ,mechanical pressure safety switch means in pressure sensing relationship with the interior of said bladder preset for a preselected pressure at which the press may be safely opened;

    whereby the blowdown time for each said press is variable from one curing cycle to another, depending upon the difference in pressure between said interior of the bladder and the common manifold, but said mold halves are separable at the end of a blowdown cycle soon after said first and second signals are matched.

View all claims
  • 11 Assignments
Timeline View
Assignment View
    ×
    ×