Methods and apparatus for making an asphalt-aggregate pavement
First Claim
1. The method of laying an asphalt-aggregate pavement mat comprising the steps of:
- (a) operating a finishing machine of the type having a screed for forming an asphalt-aggregate pavement mat;
(b) operating a plurality of delivery trucks to transport the asphalt-aggregate material in a sequential manner from an asphalt plant to the job site;
(c) providing a self-propelled mobile apparatus which includes;
(i) hopper means,(ii) first conveyor means for receiving the asphalt-aggregate material from a delivery truck and for advancing the material to the hopper means, and(iii) second conveyor means for transporting the asphalt-aggregate material laterally from the hopper means to the finishing machine;
(d) operating the self-propelled mobile apparatus for transferring the asphalt-aggregate material from the delivery trucks one at a time to the hopper means; and
(e) operating the self-propelled mobile apparatus for transferring material from such apparatus to the finishing machine while the former is positioned to one side of the latter.
15 Assignments
0 Petitions
Accused Products
Abstract
An apparatus and method for delivering asphalt-aggregate material from a plurality of supply trucks to a finishing machine. In a preferred form of the invention the hopper of the finishing machine is modified to have a capacity substantially equal to the capacity of one of the supply trucks. The apparatus is a self-propelled storage vehicle including a hopper having a capacity substantially equal to the capacity of one of the supply trucks, a high capacity loading conveyor, and a high capacity unloading conveyor system. A transversely disposed screw auger is provided for remixing the asphalt-aggregate material in the hopper prior to its discharge to the finishing machine. In the first method of operation the storage vehicle shuttles between the finishing machine and a remote location of the supply trucks and in the second method of operation the storage vehicle travels in tandem with the finishing machine as the paving operation is performed.
-
Citations
20 Claims
-
1. The method of laying an asphalt-aggregate pavement mat comprising the steps of:
-
(a) operating a finishing machine of the type having a screed for forming an asphalt-aggregate pavement mat; (b) operating a plurality of delivery trucks to transport the asphalt-aggregate material in a sequential manner from an asphalt plant to the job site; (c) providing a self-propelled mobile apparatus which includes; (i) hopper means, (ii) first conveyor means for receiving the asphalt-aggregate material from a delivery truck and for advancing the material to the hopper means, and (iii) second conveyor means for transporting the asphalt-aggregate material laterally from the hopper means to the finishing machine; (d) operating the self-propelled mobile apparatus for transferring the asphalt-aggregate material from the delivery trucks one at a time to the hopper means; and (e) operating the self-propelled mobile apparatus for transferring material from such apparatus to the finishing machine while the former is positioned to one side of the latter. - View Dependent Claims (2)
-
-
3. The method of laying an asphalt-aggregate pavement mat comprising the steps of:
-
(a) operating a finishing machine of the type having a screed for forming an asphalt-aggregate pavement mat; (b) operating a plurality of delivery trucks to transport the asphalt-aggregate material in a sequential manner from an asphalt plant to the job site; (c) providing a self-propelled mobile apparatus which includes; (i) hopper means, (ii) first conveyor means for receiving the asphalt-aggregate material from a delivery truck and for advancing the material to the hopper means, and (iii) second conveyor means for transporting the asphalt-aggregate material laterally from the hopper means to the finishing machine; (d) shuttling the self-propelled mobile apparatus back and forth between the delivery trucks and the finishing machine for intermittently delivering the asphalt-aggregate material from the former to the latter; and (e) transferring the asphalt-aggregate material from the self-propelled mobile apparatus to the finishing machine while the former is positioned to one side of the latter. - View Dependent Claims (4)
-
-
5. The method of laying an asphalt-aggregate pavement mat comprising the steps of:
-
(a) operating a finishing machine of the type having a screed for forming an asphalt-aggregate pavement mat; (b) operating a plurality of delivery trucks to transport the asphalt-aggregate material in a sequential manner from an asphalt plant to the job site; (c) providing a self-propelled mobile apparatus which includes; (i) a chassis supporting hopper means in substantial symmetrical relationship with the longitudinal centerline of the chassis, (ii) first conveyor means arranged substantially symmetrically with the longitudinal centerline of the chassis for receiving the asphalt-aggregate material from a delivery truck and for advancing the material to the hopper means, and (iii) second conveyor means in the form of a swinging conveyor which may be swung horizontally such that the discharge end thereof alternately extends beyond each lateral extremity of the self-propelled mobile apparatus for transferring the asphalt-aggregate material from the self-propelled mobile apparatus to the finishing machine while the former is positioned to one side of the latter; (d) operating the self-propelled mobile apparatus for transferring the asphalt-aggregate material from the delivery trucks one at a time to the finishing machine ; and (e) operating said first conveyor means for transferring material from a truck to said hopper means at a rate in the range of about 800-1200 tons per hour. - View Dependent Claims (6)
-
-
7. A self-propelled mobile apparatus for supplying asphalt-aggregate material from a delivery truck to a finishing machine comprising:
-
(a) chassis means including ground engaging mobile support means and steering means for at least a part of the support means; (b) motive power means carried by chassis means and connected to at least a part of said support means; (c) hopper means mounted on said chassis means; (d) first conveyor means mounted on said chassis means and having a receiving portion adapted to receive the asphalt-aggregate material as it is discharged from the delivery truck, said first conveyor means having a receiving end with a width at least as great as the width of the bed of the delivery truck for rapidly receiving the contents of the latter, said first conveyor means also having a delivery portion for discharging the asphalt-aggregate material into said hopper means; (e) second conveyor means mounted on said chassis means for transporting the asphalt-aggregate material to the finishing machine; and (f) transversely disposed third conveyor means mounted in the lower portion of said hopper means for delivering the asphalt-aggregate material to said second conveyor means. - View Dependent Claims (8, 9, 10, 11, 12, 13)
-
-
14. A self-propelled mobile apparatus for supplying asphalt-aggregate material from a delivery truck to a finishing machine comprising:
-
(a) chassis means including ground engaging mobile support means and steering means for at least a part of the support means; (b) motive power means carried by chassis means and connected to at least a part of said support means; (c) hopper means mounted on said chassis means in substantial symmetrical relationship with the longitudinal centerline of the chassis means and having a capacity at least as large as the capacity of the delivery truck; (d) first conveyor means mounted on said chassis means in substantial symmetrical relationship with the longitudinal centerline of the latter and having a receiving portion adapted to receive the asphalt-aggregate material as it is discharged from the delivery truck, said receiving portion having a width at least as great as the width of the delivery truck, said first conveyor means also having a delivery portion for discharging the asphalt-aggregate material into said hopper means; (e) second conveyor means mounted on said chassis means for transporting the asphalt-aggregate material to the finishing machine; and (f) transversely disposed screw auger means mounted in the lower portion of said hopper means for delivering the asphalt-aggregate material to said second conveyor means. - View Dependent Claims (15, 16, 17, 18, 19, 20)
-