×

Submersible production storage barge and method for transporting and installing a jack-up rig in a body of water

  • US 4,907,912 A
  • Filed: 10/05/1988
  • Issued: 03/13/1990
  • Est. Priority Date: 10/05/1988
  • Status: Expired due to Fees
First Claim
Patent Images

1. A method for transporting and installing, in a body of water, a jack-up rig, having a hull and a plurality of jack-up legs, comprising the steps of:

  • (a) associating a submersible production storage barge, having an upper wall surface, with the hull of the jack-up rig;

    (b) passing the plurality of jack-up legs through openings formed in the submersible production storage barge and releasably securing the submersible production storage barge to the jack-up rig;

    (c) moving the jack-up rig and submersible production storage barge to a desired site in the body of water, the jack-up rig being disposed above the upper wall surface of the submersible production storage barge while the jack-up rig and the submersible production storage barge are being moved; and

    (d) lowering the plurality of jack-up legs and the submersible production storage barge until they rest upon a surface below the body of water.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×