1. A method for transporting and installing, in a body of water, a jack-up rig, having a hull and a plurality of jack-up legs, comprising the steps of:
- (a) associating a submersible production storage barge, having an upper wall surface, with the hull of the jack-up rig;
(b) passing the plurality of jack-up legs through openings formed in the submersible production storage barge and releasably securing the submersible production storage barge to the jack-up rig;
(c) moving the jack-up rig and submersible production storage barge to a desired site in the body of water, the jack-up rig being disposed above the upper wall surface of the submersible production storage barge while the jack-up rig and the submersible production storage barge are being moved; and
(d) lowering the plurality of jack-up legs and the submersible production storage barge until they rest upon a surface below the body of water.
2 Assignments
0 Petitions
Accused Products
Abstract
A submersible production storage barge and method for transporting and installing a jack-up rig in a body of water has the submersible production storage barge releasably secured to a jack-up rig while the jack-up rig and submersible production storage barge are towed as a unit to the desired offshore location.
60 Citations
16 Claims
-
1. A method for transporting and installing, in a body of water, a jack-up rig, having a hull and a plurality of jack-up legs, comprising the steps of:
-
(a) associating a submersible production storage barge, having an upper wall surface, with the hull of the jack-up rig; (b) passing the plurality of jack-up legs through openings formed in the submersible production storage barge and releasably securing the submersible production storage barge to the jack-up rig; (c) moving the jack-up rig and submersible production storage barge to a desired site in the body of water, the jack-up rig being disposed above the upper wall surface of the submersible production storage barge while the jack-up rig and the submersible production storage barge are being moved; and (d) lowering the plurality of jack-up legs and the submersible production storage barge until they rest upon a surface below the body of water. - View Dependent Claims (2, 3, 4, 5, 6, 7)
-
-
8. A submersible production storage barge, adapted to be transported and installed in a body of water with a jack-up rig having a hull and a plurality of jack-up legs comprising:
-
(a) a plurality of wall members defining at least one enclosed cavity for the storage of hydrocarbon fluids, the plurality of wall members forming an upper wall surface, a lower wall surface, and at least one side wall surface; and (b) means for releasably secured the plurality of wall members to the jack-up rig while the jack-up rig is being transported to a site in the body of water, whereby a jack-up rig and plurality of walls members may be transported together to the site int he body of water, the releasable securing means including a plurality of openings formed in the upper and lower wall surfaces through while the plurality of jack-up legs pass through, where the plurality of wall members may be lowered to rest upon a surface below the body of water. - View Dependent Claims (9, 10, 11, 12, 13, 14, 15, 16)
-