Method of conducting well operations from a moveable floating platform
First Claim
1. A method of simultaneously conducting well operations at a first underwater well and a second underwater well from a moveable platform floating upon the surface of a body of water, said platform having;
- well operations equipment thereon, andanchor cable length adjustment means carried by said platform and being operable to regulate the length and tension of anchor cables operatively engaged to said anchor cable length adjustment means, said anchor cables depending downward from said anchor cable length adjustment means through said body of water to discrete anchors arranged in an array at the bottom of said body of water, said platform thereby operatively connected to said anchors by said anchor cables and anchored in a first vertical position, said first vertical position defined by a substantially vertical relationship between said platform and an area defined within the perimeter formed by the anchors of said anchor array, said method of simultaneously conducting well operations at said first underwater well and said second underwater well including the steps of;
operatively engaging a marine riser between said floating platform and well equipment disposed upon the bottom of said body of water positioned at said first underwater well located substantially beneath said floating platform,laterally displacing and bending a portion of said marine riser by moving said floating platform from said first vertical position to a second vertical position defined by a substantially vertical relationship between said platform and said second underwater well by adjusting the length of said anchor cables, andlowering well operations equipment means into contact with the bottom of said body of water at said second underwater well, said well operations equipment means operatively engaged to the lower end of conduit means that depend downwardly from said floating platform, the upper end of said conduit means operatively engaged to the lower end of conduit means that depend downwardly from said floating platform, the upper end of said conduit means operatively engaged to said floating platform.
1 Assignment
0 Petitions
Accused Products
Abstract
A method is described for conducting well operations from a floating platform that may be moved to various locations above subterranean formations. Marine risers that have been previously connected to the platform flex sufficiently to allow this movement. The mobility of the platform allows well drilling, completion, producing, and workover activities to be conducted simultaneously through the risers attached to the platform. The mobility of the platform also allows new wells to be drilled at more preferable locations than those that would be available from a fixed bottom supported well template.
43 Citations
13 Claims
-
1. A method of simultaneously conducting well operations at a first underwater well and a second underwater well from a moveable platform floating upon the surface of a body of water, said platform having;
-
well operations equipment thereon, and anchor cable length adjustment means carried by said platform and being operable to regulate the length and tension of anchor cables operatively engaged to said anchor cable length adjustment means, said anchor cables depending downward from said anchor cable length adjustment means through said body of water to discrete anchors arranged in an array at the bottom of said body of water, said platform thereby operatively connected to said anchors by said anchor cables and anchored in a first vertical position, said first vertical position defined by a substantially vertical relationship between said platform and an area defined within the perimeter formed by the anchors of said anchor array, said method of simultaneously conducting well operations at said first underwater well and said second underwater well including the steps of; operatively engaging a marine riser between said floating platform and well equipment disposed upon the bottom of said body of water positioned at said first underwater well located substantially beneath said floating platform, laterally displacing and bending a portion of said marine riser by moving said floating platform from said first vertical position to a second vertical position defined by a substantially vertical relationship between said platform and said second underwater well by adjusting the length of said anchor cables, and lowering well operations equipment means into contact with the bottom of said body of water at said second underwater well, said well operations equipment means operatively engaged to the lower end of conduit means that depend downwardly from said floating platform, the upper end of said conduit means operatively engaged to the lower end of conduit means that depend downwardly from said floating platform, the upper end of said conduit means operatively engaged to said floating platform. - View Dependent Claims (2, 3, 4)
-
-
5. A method of simultaneously conducting well operations at a first underwater well and a second underwater well from a platform floating upon the surface of a body of water, said platform having;
-
well operations equipment thereon, and platform positioning means capable of maintaining said platform in a first vertical position and a second vertical position, said positioning means operatively engaged to said platform, said method of simultaneously conducting said well operations at said first underwater well and said second underwater well including the steps of; operatively engaging a marine riser between said floating platform positioned at said first vertical position and well equipment disposed upon the bottom of said body of water positioned at said first underwater well located substantially beneath said floating platform, laterally displacing and bending a portion of said marine riser by moving said floating platform from said first vertical position to said second vertical position defined by a substantially vertical relationship between said platform and said underwater well by activation of said platform positioning means, and lowering well operations equipment means into contact with the bottom of said body of water at said second underwater well, said well operations equipment means operatively engaged to the lower end of conduit means that depend downwardly from said floating platform, the upper end of said conduit means operatively engaged to said floating platform. - View Dependent Claims (6, 7)
-
-
8. A method or simultaneously conducting well operations at a first underwater well and a second underwater well from a moveable platform floating upon the surface of a body of water, said platform having;
-
well operations equipment thereon, and platform positioning means capable of maintaining said platform in a first vertical position and subsequently moving said platform from said first vertical position to a second vertical position and maintaining said platform in said second vertical position, said first vertical position defined by a substantially vertical relationship between said platform and a location on the bottom of said body of water, said positioning means operatively engaged to said platform, said method of simultaneously conducting said well operations at said first underwater well and said second underwater well including the steps of; operatively engaging a marine riser between said floating platform and well equipment disposed upon the bottom of said body of water positioned at said first underwater well located substantially beneath said floating platform, laterally displacing and bending a portion of said marine riser by moving said floating platform from said first vertical position to said second vertical position defined by a substantially vertical relationship between said platform and said location for said second underwater well upon said bottom of said body of water by activation of said platform positioning means, and lowering well operations equipment means into contact with the bottom of said body of water at said location for said second underwater well, said well operations equipment means operatively engaged to the lower end of conduit means that depend downwardly from said floating platform, the upper end of said conduit means operatively engaged to said floating platform.
-
-
9. A method of simultaneously conducting well operations at a first underwater well and at a second underwater well from a platform floating upon the surface of a body of water, said method including the steps of;
-
providing a vertically-oriented marine riser operatively engaged between said platform, and said first underwater well disposed vertically below said platform upon the bottom of said body of water, moving said platform from said vertical position above said first underwater well, thereby laterally displacing and bending a portion of said marine riser, positioning said platform vertically above said second underwater well, lowering well operations equipment means from said floating platform downward into contact with said second underwater well, and placing said first underwater well and said second underwater well in fluid communication with said platform.
-
-
10. A method of simultaneously conducting well operations at a first well and at a second well from a platform floating upon the surface of a body of water, said method including the steps of;
-
positioning said floating platform above said first well, operatively engaging a first marine riser between said floating platform and said first well thereby initiating well operations at said first well, moving said platform away from above said first well, movement of said platform laterally displacing and bending a portion of said first marine riser, and initiating well operations at said second well by use of well operations equipment means lowered downwardly from said floating platform into contact with the bottom of said body of water.
-
-
11. A method of simultaneously conducting well operations at a first well and at a second well from a platform floating upon the surface of a body of water, said method including the steps of;
-
positioning said floating platform above said first well, operatively engaging a first marine riser between said floating platform and said first well thereby initiating well operations at said first well, moving said platform away from above said first well, movement of said platform laterally displacing and bending a portion of said first marine riser, and operatively engaging a second marine riser between said floating platform and said second well thereby initiating well operations at said second well.
-
-
12. A method of simultaneously conducting well operations at a first well and at a second well from a platform floating upon the surface of a body of water, said method including the steps of;
-
positioning said floating platform in said body of water at a first vertical position, drilling a first well below said floating platform by use of well operations equipment means lowered downwardly from said floating platform into contact with the bottom of said body of water, thereby initiating well operations at said first well, preparing said first well to produce well fluids to said platform by operatively engaging a first marine riser between said first well and said platform, moving said platform away from above said first well to a second vertical position, movement of said platform laterally displacing and bending a portion of said first marine riser, and drilling a second well below said floating platform, thereby initiating well operations at said second well.
-
-
13. A method of simultaneously conducting well operations at a first well and at a second well from a platform floating upon the surface of a body of water, said method including the steps of;
-
positioning said floating platform in said body of water at a first vertical position, drilling a first well below said floating platform, by use of well operations equipment means lowered downwardly from said floating platform into contact with the bottom of said body of water, thereby initiating well operations at said first well, preparing said first well to produce well fluids to said platform by operatively engaging a first marine riser between said first well and said platform, moving said platform away from above said first well to a second vertical position above said second well, movement of said platform laterally displacing and bending a portion of said first marine riser, and operatively engaging a second marine riser between said floating platform and said second well, thereby initiating well operations at said second well.
-
Specification