×

Expert system scheduler

  • US 5,040,123 A
  • Filed: 09/08/1989
  • Issued: 08/13/1991
  • Est. Priority Date: 09/08/1989
  • Status: Expired due to Fees
First Claim
Patent Images

1. A computer implemented method of scheduling a plurality of machine operations in a predetermined sequence in a factory containing a plurality of machines and a factory control system which controls the machines in accordance with the schedule, comprising the steps of:

  • a. constructing a computer model of the factory comprising data relating to the production of parts including inventory, operations, machines, and at least one customer order,b. scheduling the machine operations necessary to produce the parts in the customer order in the reverse order of routing with the last operation being scheduled first and the first operation being scheduled last,c. modifying the schedule defined in scheduling step b. by removing machine operations which are unnecessary due to existing factory part inventory to thereby better utilize available machine capacity,d. further modifying the schedule produced in schedule modifying step c. by shifting certain operations forward in time to insure that no operations are scheduled prior to a predetermined build context time.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×