×

Method of forming zigzag-shaped piles from a continuous band of a flexible material and machine for carrying out this method

  • US 5,064,179 A
  • Filed: 04/11/1991
  • Issued: 11/12/1991
  • Est. Priority Date: 12/10/1987
  • Status: Expired due to Fees
First Claim
Patent Images

1. A method for forming piles from a continuous band of a flexible material comprising the steps of:

  • providing the continuous band with transverse folding lines such that a folding flap is defined between adjacent folding lines;

    conveying the continuous band in a forward direction along a path that is in the vicinity of a stationary rupture device;

    folding the continuous band along said transverse folding lines and depositing the folded flaps on a support and a pile forming station that is downstream from said path such that said folding flaps are arranged in a zigzag configuration and stacked in the form of a pile;

    rupturing the continuous band at a predetermined folding line between two flaps, the downward flap being designed to become the last flap of a pile that is about to be formed and the upward flap being designed to become the first flap of a new pile to be formed;

    determining the instant of time when said predetermined rupture folding line arrives in a zone substantially in front of said rupture device;

    deviating the continuous band with said rupture folding line being in said zone in front of said rupture device, in a direction substantially perpendicular to said path at a location near to said rupture device such that the region of the continuous band encompassing said predetermined rupture folding line is forced against said rupture device and subjected to traction forces that rupture said continuous band along said predetermined folding line, thereby separating said first and last flaps, without stopping the forward motion of the continuous band;

    maintaining said first and last flaps in close proximity to one another as said separate band continues forward towards a pile forming station;

    depositing said last flap on said pile being formed to form a complete pile and removing said complete pile from said pile forming station; and

    positioning said first flap for forming said new pile.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×