×

Sand control in wells with gas generator and resin

  • US 5,101,900 A
  • Filed: 12/27/1990
  • Issued: 04/07/1992
  • Est. Priority Date: 07/21/1989
  • Status: Expired due to Term
First Claim
Patent Images

1. A method of treating a wellbore having formation perforations for controlling sand and other fine materials comprising the steps of:

  • (a) positioning a quantity of fluid resin material in alignment with the formation perforations of the wellbore;

    (b) positioning a gas generator in proximity with the fluid resin material;

    (c) actuating the gas generator to increase wellbore pressure in a substantially instantaneous manner to a pressure substantially in excess of well pressure to force the fluid resin material from the wellbore into the formation perforations; and

    (d) subsequently polymerizing the resin material to form a consolidated, porous, permeable matrix which retains the sand and other fine materials while permitting the flow of production fluid into the wellbore.

View all claims
  • 4 Assignments
Timeline View
Assignment View
    ×
    ×