Device for the substitution of the rails of railway tracks

  • US 5,181,472 A
  • Filed: 07/09/1991
  • Issued: 01/26/1993
  • Est. Priority Date: 07/13/1990
  • Status: Expired due to Term
First Claim
Patent Images

1. Device for the continuous substitution of the rails of railway tracks, comprising:

  • a train composed of a welding vehicle and a heating vehicle, both running on old rails with said welding vehicle running before said heating vehicle, and an assembly vehicle running on new rails;

    (A) wherein said welding vehicle includes;

    (1) means for positioning the new rails to be welded and previously brought to the site between the old rails,(2) at least one welding unit for welding the adjacent ends of the new rails which pass below the axles of said welding vehicle, and(3) a grinding unit,wherein said means for positioning said at least one welding unit and said grinding unit are installed between leading and rear bogies of the welding vehicle;

    (B) wherein said heating vehicle includes;

    (1) at least one heating tunnel for each new rail, equipped with a facility for induction heating, said tunnel being traversed continuously be the new rail during the advance of the train in order to neutralize said new rail, said heating tunnel being located between the old rails and below the body of the heating vehicle, the new rails passing below the axles and between the wheels of said heating vehicle;

    (2) means for measuring and controlling the temperature of the new rails;

    (3) means for gripping the new rails to introduce them into said tunnel;

    (4) stations for releasing the old rails from sleepers, said stations being installed between bogies of said heating vehicle; and

    (5) means for guiding the old rails that are detached; and

    (C) wherein said assembly vehicle running on the new rails laid upon the sleepers includes;

    (1) means for guiding and for laying the new rails on the sleepers, said means being disposed at a front end of said assembly vehicle, and(2) working stations for fastening to the sleepers the new rails brought to the desired temperature.

View all claims