×

Intelligent computer integrated maintenance system and method

  • US 5,216,612 A
  • Filed: 07/16/1990
  • Issued: 06/01/1993
  • Est. Priority Date: 07/16/1990
  • Status: Expired due to Term
First Claim
Patent Images

1. A computer integrated maintenance system for use with a computer integrated manufacturing system, the computer integrated manufacturing system including a computer controller for controlling a plurality of production complexes each of which includes a plurality of production machines, the manufacturing system computer controller including an electronically stored master schedule file having therein a schedule of actual production and planned production for the plurality of complexes, the manufacturing system computer controller controlling the plurality of production machines based upon the planned production in the master schedule file;

  • said computer integrated maintenance system comprising;

    an electronically stored parts manual, containing a hierarchical listing of parts in the plurality of production machines in the plurality of production complexes; and

    ,maintenance operations computer controlling means, communicatively connected to said electronically stored parts manual and adapted to be communicatively connected to the master schedule file, comprising;

    first means for obtaining a schedule of actual production and planned production for the plurality of complexes from the master schedule file;

    second means for identifying parts in the hierarchical listing to be maintained during a predetermined time period, and a corresponding maintenance time during the predetermined time period for each identified part, based upon the obtained schedule;

    third means for reassigning the corresponding maintenance times for the identified parts, based upon the hierarchical listing of parts in the electronically stored parts manual, to reduce lost production time for each of the plurality of complexes;

    fourth means for generating a revised schedule of planned production based upon the reassigned maintenance times for the identified parts; and

    fifth means for communicating the revised schedule of planned production to the master schedule file;

    whereby the plurality of complexes are controlled based upon the revised schedule of planned production to allow for maintenance activities while maximizing production.

View all claims
  • 5 Assignments
Timeline View
Assignment View
    ×
    ×