Method and system for controlling electric loads with high reliability
First Claim
1. A system for controlling plural loads with high reliability, comprisingplural control devices which are provided corresponding to the respective loads for respectively controlling a corresponding one of the plural loads,plural switches for switching over a control device connected to the load from one of the plural loads to another of the plural loads, anda monitor circuit for detecting at least one of the control devices which is out of order, for selecting another of the control devices which is out of order, for selecting another of the control devices which is not out of order based on superiority among the loads and for actuating the plural switches so as to disconnect said one of the control devices from the loads corresponding to said one of the control devices and to switch over said one of the control devices from the load having been connected to said one of the control devices to the load corresponding to said other of the control devices.
1 Assignment
0 Petitions
Accused Products
Abstract
A system and method for controlling plural load with high reliability, comprising plural control devices for respectively controlling the plural electric loads, plural switches for respectively giving ordering signals to the control devices to control the respective loads, and a monitor circuit for detecting an out of order control device and generating ordering signals for selecting another control device which is not out of order based on the superiority of the other electric load and the ordering signals from the switches which correspond to the other control device to change from the control device which is out of order to the other control device.
18 Citations
13 Claims
-
1. A system for controlling plural loads with high reliability, comprising
plural control devices which are provided corresponding to the respective loads for respectively controlling a corresponding one of the plural loads, plural switches for switching over a control device connected to the load from one of the plural loads to another of the plural loads, and a monitor circuit for detecting at least one of the control devices which is out of order, for selecting another of the control devices which is out of order, for selecting another of the control devices which is not out of order based on superiority among the loads and for actuating the plural switches so as to disconnect said one of the control devices from the loads corresponding to said one of the control devices and to switch over said one of the control devices from the load having been connected to said one of the control devices to the load corresponding to said other of the control devices.
-
5. A system for controlling plural loads with high reliability, comprising
plural control devices which are provided corresponding to the respective loads for respectively controlling a corresponding one of the plural loads, plural switches for switching over a control device connected to the load from one of the plural loads to another of the plural loads, and a monitor circuit for detecting at least one of the control devices which is out of order, for selecting another of the control devices which is not out of order based on superiority among the loads and for actuating the plural switches so as to disconnect said other of the control devices from one of the loads corresponding to the other control device and to switch over the load corresponding to said one of the control devices between said one of the control devices and said other of the control devices in a time sharing mode.
-
11. A method for controlling plural loads respectively corresponding to plural control devices with high reliability, comprising the steps of
detecting at least one of the control devices which is out of order, selecting another of the control devices which is not out of order based on superiority among the electric loads, and disconnecting said other of the control devices from one of the loads corresponding to the other control device and switching over the load corresponding to said one of the control devices from said one of the control devices to said other of the control devices.
-
12. A method for controlling plural loads respectively corresponding to plural control devices with high reliability, comprising the steps of
detecting at least one of the control devices which is out of order, selecting another of the control devices which is not out of order based on superiority among the electric loads, and disconnecting said other of the control devices from one of the loads corresponding to the other control device and switching over the load corresponding to said one of the control devices between said one of the control devices and said other of the control devices in a time sharing mode.
Specification