×

Method and apparatus for load shedding using a trainline monitor system

  • US 5,293,632 A
  • Filed: 03/18/1992
  • Issued: 03/08/1994
  • Est. Priority Date: 03/18/1992
  • Status: Expired due to Fees
First Claim
Patent Images

1. A method for controlling power consumed by a plurality of subsystems on a multi-car train having a plurality of power supplies connected in parallel for supplying power to the subsystems and a train wide communication network including a vehicle bus in each car of the train communicating with the power supplies and subsystems on the car, a train bus extending through the entire train, and communication nodes in each car interconnecting the train bus with each one of the vehicle buses, with one of the communication nodes in one of the cars constituting a master node and the other communication nodes in the other cars constituting slave nodes, each slave node communicating status information about power supplies and subsystems on its vehicle bus to the master node and communicating control information to the power supplies and subsystems on its vehicle bus, said method comprising:

  • using the communications network to periodically ascertain how many of the power supplies connected in parallel are operating;

    determining, based on how many power supplies are operating and therefore available for supplying power at any given time, a first variable correpsonding to total power available for power consuming sybsystems on the train; and

    selectively reducing power consumption of subsystems on the train by way of the communications network in accordance with the first variable determined by said step of determining.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×