Method for improving cement placement in horizontal wells
First Claim
1. A well completion process for improved cement placement in a horizontal wellbore located in a formation comprising:
- a) circulating a cleaning fluid down the wellbore in an amount and for a time sufficient to condition and clean it for cementing a production tubing or casing in place;
b) directing a production tubing with centralizers therearound into the wellbore thereby locating the tubing centrally within the wellbore;
c) directing a cement spacer fluid down an annulus formed between the tubing and wellbore so as to substantially clean-out the wellbore;
d) directing a first cement slurry down the annulus and up the tubing which cement slurry has a density greater than the cement spacer fluid and is in an amount sufficient to fill the annulus; and
e) directing a second cement slurry down the annulus which cement slurry has density less than the density of the first cement slurry and which overrides the first cement slurry thereby filling any voids that were unfilled by the first cement slurry so as to effectively isolate the casing from the formation.
1 Assignment
0 Petitions
Accused Products
Abstract
A well completion process for improved cement placement in a horizontal wellbore where a fluid is circulated down the wellbore for conditioning and cleaning it. Afterwards, a production tube containing centralizers is positioned centrally within the wellbore. Next, a "spacer fluid" is circulated within an annulus formed by the space between the tube and the wellbore so as to clean the annulus out. Subsequently, a cement having a density greater than the spacer fluid is pumped into the annulus. Thereafter, a light weight cement is pumped into the annulus thereby overriding the heavier cement and removing voids in the annulus resulting in more efficient cement placement.
-
Citations
3 Claims
-
1. A well completion process for improved cement placement in a horizontal wellbore located in a formation comprising:
-
a) circulating a cleaning fluid down the wellbore in an amount and for a time sufficient to condition and clean it for cementing a production tubing or casing in place; b) directing a production tubing with centralizers therearound into the wellbore thereby locating the tubing centrally within the wellbore; c) directing a cement spacer fluid down an annulus formed between the tubing and wellbore so as to substantially clean-out the wellbore; d) directing a first cement slurry down the annulus and up the tubing which cement slurry has a density greater than the cement spacer fluid and is in an amount sufficient to fill the annulus; and e) directing a second cement slurry down the annulus which cement slurry has density less than the density of the first cement slurry and which overrides the first cement slurry thereby filling any voids that were unfilled by the first cement slurry so as to effectively isolate the casing from the formation. - View Dependent Claims (2, 3)
-
Specification