×

Method for improving cement placement in horizontal wells

  • US 5,320,172 A
  • Filed: 09/28/1992
  • Issued: 06/14/1994
  • Est. Priority Date: 09/28/1992
  • Status: Expired due to Fees
First Claim
Patent Images

1. A well completion process for improved cement placement in a horizontal wellbore located in a formation comprising:

  • a) circulating a cleaning fluid down the wellbore in an amount and for a time sufficient to condition and clean it for cementing a production tubing or casing in place;

    b) directing a production tubing with centralizers therearound into the wellbore thereby locating the tubing centrally within the wellbore;

    c) directing a cement spacer fluid down an annulus formed between the tubing and wellbore so as to substantially clean-out the wellbore;

    d) directing a first cement slurry down the annulus and up the tubing which cement slurry has a density greater than the cement spacer fluid and is in an amount sufficient to fill the annulus; and

    e) directing a second cement slurry down the annulus which cement slurry has density less than the density of the first cement slurry and which overrides the first cement slurry thereby filling any voids that were unfilled by the first cement slurry so as to effectively isolate the casing from the formation.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×