×

Production instructing apparatus for feeding required quantities of materials to meet an appointed delivery date

  • US 5,325,304 A
  • Filed: 05/02/1991
  • Issued: 06/28/1994
  • Est. Priority Date: 05/18/1990
  • Status: Expired due to Fees
First Claim
Patent Images

1. A production instructing apparatus which allocates products being manufactured in the producing apparatuses of respective producing processes and stock products to an order of the products in an appointed quantity and of an appointed delivery date of a customer, and instructs feeding of required products, not being manufactured or in stock, to said production apparatus so that the appointed quantity of products can be delivered at the appointed delivery date to fill said order of products, said production apparatus comprising,a first memory means for storing data specifying the quantity of ordered products being manufactured and in stock,a second memory means for storing the producing capacity of the ordered products of said respective producing apparatuses and a first schedule showing vacancies in a production schedule of said respective producing apparatuses;

  • a first calculating means for calculating the necessary feeding quantity of required ordered products by subtracting the amount of ordered products being manufactured and in stock stored in said first memory means from the appointed quantity of ordered products, for calculating the latest feeding start date for beginning producing the required quantity of ordered products for delivery prior to the appointed delivery date based on producing capacity stored in said second memory means, for calculating a calculated schedule of production of said necessary feeding quantity in vacancies in the production schedule of said respective producing apparatuses based on the schedule stored in said second memory, with said calculated schedule including a scheduled shipping date indicating when said necessary feeding quantity will be ready to ship; and

    an instructing means for instructing feeding of said required articles to said producing apparatuses according to the calculated schedule of production of said necessary feeding quantity of ordered products if said scheduled shipping date is prior to said appointed delivery date.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×