×

Method of and system for disconnecting faulty distribution line section from power distribution line

  • US 5,341,268 A
  • Filed: 12/14/1992
  • Issued: 08/23/1994
  • Est. Priority Date: 12/16/1991
  • Status: Expired due to Fees
First Claim
Patent Images

1. For use with an electric power system including a main controller installed in a distribution substation having a circuit breaker and distribution line fault detecting means, a plurality of section controllers installed in section switches which divide a distribution line drawn out from said distribution substation into a plurality of line sections, and a transmission system for signal transmission between said main controller and said section controllers, a method of carrying out control for, when a fault occurs on said distribution line, disconnecting only a faulty line section from said distribution line, comprising:

  • the first step of transmitting a request signal from said main controller to said transmission system when said distribution line fault detecting means detects a fault on said distribution line;

    the second step of receiving said request signal transmitted from said main controller over said transmission system by said section controllers;

    the third step of detecting the fault by said section controllers;

    the fourth step of transmitting to said transmission system fault detect signals indicating a fault or non fault from said section controllers which have received said request signal in the second step or performed in the third step;

    the fifth step of, by each of said section controllers, receiving said fault detect signals transmitted from other section controllers over said transmission system;

    the sixth step of, by each of said section controllers, Judging whether or not its associated section switch divides said distribution line between faulty and normal line sections on the basis of said fault detect signals received from said other section controllers in the fifth step; and

    the seventh step of, by each of said section controllers, opening its associated section switch when it is judged in the sixth step that its associated section switch is dividing said distribution line between faulty and normal line sections.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×