Method and apparatus for power plant simulation and optimization
First Claim
1. A method for simulating operation of a powerhouse and optimizing the operating characteristics thereof, said powerhouse including at least one steam turbine driven electric generator and at least one boiler for generating steam for said turbine, in which predetermined constants include the electrical power demand required by a process plant powered by said powerhouse, the cost of purchased electric power required to satisfy said demand which cannot be supplied by said powerhouse, and the cost of fuel required to operate said boiler, said method comprising the steps of defining the operating characteristics of said generator which represent a generator output power which satisfies said demand or which represent the maximum capacity of said generator, said defined generator operating characteristics including the required steam flow from said boiler to operate said generator, defining the operating characteristics of said boiler which produce said required steam flow, said defined boiler operating characteristics including the amount of fuel per unit time to operate said boiler, calculating the operating cost for the power plant consisting of the cost of the fuel per unit time plus the cost of said purchased power per unit time, randomly varying a plurality of the operating characteristics of said generator and said boiler by simulation, calculating said operating cost associated with said simulated randomly varied operating characteristics, and iteratively repeating said simulated random varying of operating characteristics and calculation of operating costs until an optimized lower total operating cost is arrive at, and manifesting the operating characteristics associated with said lower operating cost.
2 Assignments
0 Petitions
Accused Products
Abstract
A system for simulating and optimizing a powerhouse, designed to furnish electrical power to a process plant, incorporates a plurality of units for simulating operation of the individual components of the powerhouse, and for calculating the cost of operation of the system as a whole, including the cost of fuel for the powerhouse components and the cost of purchased power needed to satisfy the power demand of the process plant beyond the capacity of the powerhouse. An adaptive search routine varies all of the operative parameters of the powerhouse, on a random basis, and repeats the simulation, in order to identify a combination of parameters which represents a lower cost solution. The range of random variation is reduced, as lower cost solutions are not found within a given number of repetitions, in order to identify a precise convergence on the optimum solution. The procedure may be restarted, and repeated many times, with the range of variation each time initially at maximum, in order to insure the identification of the global optimum.
-
Citations
8 Claims
- 1. A method for simulating operation of a powerhouse and optimizing the operating characteristics thereof, said powerhouse including at least one steam turbine driven electric generator and at least one boiler for generating steam for said turbine, in which predetermined constants include the electrical power demand required by a process plant powered by said powerhouse, the cost of purchased electric power required to satisfy said demand which cannot be supplied by said powerhouse, and the cost of fuel required to operate said boiler, said method comprising the steps of defining the operating characteristics of said generator which represent a generator output power which satisfies said demand or which represent the maximum capacity of said generator, said defined generator operating characteristics including the required steam flow from said boiler to operate said generator, defining the operating characteristics of said boiler which produce said required steam flow, said defined boiler operating characteristics including the amount of fuel per unit time to operate said boiler, calculating the operating cost for the power plant consisting of the cost of the fuel per unit time plus the cost of said purchased power per unit time, randomly varying a plurality of the operating characteristics of said generator and said boiler by simulation, calculating said operating cost associated with said simulated randomly varied operating characteristics, and iteratively repeating said simulated random varying of operating characteristics and calculation of operating costs until an optimized lower total operating cost is arrive at, and manifesting the operating characteristics associated with said lower operating cost.
-
8. Apparatus for simulating and optimizing a powerplant having at least a steam turbine generator and a boiler for generating steam for said steam turbine generator, comprising, in combination;
-
first means representing an algorithm which relates a plurality of independent and dependent variables describing operation of said steam turbine generator, second means representing an algorithm which relates the independent and dependent variables describing operation of said boiler, memory means for storing data representative of the cost of fuel for said boiler, the power demand for a process plant powered by said powerhouse, and the cost of purchased power needed to satisfy any portion of said power demand which cannot be satisfied by said steam turbine generator, means for supplying to said first means from said memory means said data representative of said power demand, whereby said first means develops data representative of the steam requirements of said steam turbine generator in response thereto, means for supplying said steam-representative data to said second means from said first means, whereby said second means develops data representative of the fuel requirements of said boiler, third means receiving said fuel-representative data and calculating the operating cost of said powerhouse in response thereto, and for calculating the cost of purchased power required to satisfy said power demand which cannot be satisfied by said steam turbine generator, means for periodically randomly modifying the power level output of said steam turbine generator by simulation and iteratively repeating operation of said first, second and third means to calculate new values for the operating cost of said powerhouse at the modified power level, and means for storing the power level of said steam turbine generator corresponding to an optimized lower combined operating cost of said powerhouse plus the said cost of purchased power.
-