×

Slag-cement displacement by direct fluid contact

  • US 5,351,759 A
  • Filed: 10/22/1992
  • Issued: 10/04/1994
  • Est. Priority Date: 10/22/1992
  • Status: Expired due to Term
First Claim
Patent Images

1. A method for drilling and cementing a well, comprising:

  • drilling a borehole utilizing a drilling fluid, thus producing a used drilling fluid;

    combining ingredients comprising water, granulated water-quenched blast furnace slag, and activator to produce a cementitious slurry;

    disposing a pipe within said borehole;

    passing said cementitious slurry down said pipe; and

    displacing said cementitious slurry up into an annulus surrounding said pipe through direct contact by a displacement fluid comprising a portion of said used drilling fluid.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×