1. A method for modernizing the control system of a bank of elevators, wherein each elevator is controlled by a respective elevator controller, comprising the steps of:

  • (a) providing an elevator of said bank with a respective new elevator computer having a parallel communications port and at least one serial communications port, and connecting said new elevator computer to a respective elevator controller by means of a temporary adapter unit connected to said parallel communications port, whereby control of the elevator during modernization can be effected by said respective new elevator computer, at least partially through said respective elevator controller;

    (b) providing a new group controller, and connecting said new group controller and said new elevator computer to a serial communications network, whereby operation of each elevator of said bank of elevators can be effected by said new group controller, via said serial communications network and said respective new elevator computer;

    (c) connecting a monitoring unit to said serial communications network for monitoring operation of said bank of elevators;

    (d) forming a plurality of functional modules comprised of existing elevator components grouped according to the specific function performed by said components;

    (e) selecting a functional module to be modernized;

    (f) modernizing the selected functional module by;

    (f1) providing new elevator components capable of performing the same operation as corresponding old elevator components which comprise the selected functional module, each of said new elevator components being controlled by said respective new elevator computer through said serial communications network; and

    (f2) disconnecting the old elevator components which comprise the selected functional module from said respective elevator controller; and

    (g) when all operations of an elevator are being performed by new elevator components under the control of said respective new elevator computer through said serial communications network;

    (g1) providing at least one new functional unit comprising a safety system interface and elevator electrification circuits;

    (g2) removing said temporary adapter unit and said elevator controller; and

    (g3) connecting said at least one new functional unit to said respective new elevator computer through said parallel communications port of said respective new elevator computer.