Process and energy director for ultrasonic welding and joint produced thereby
First Claim
1. A process for joining first and second pieces together, the second piece having first and second sides, the process comprising the following steps:
- providing on the first piece an energy director comprising first and second ridges running substantially parallel to each other, and a groove running between the first and second ridges, wherein the first ridge has a first side adjacent the groove and a second side opposite the groove, wherein the first ridge'"'"'s first side is steeper than the first ridge'"'"'s second side;
placing the energy director against the first side of the second piece;
placing an ultrasonic horn against the second side of the second piece opposite the energy director; and
applying vibrations to the horn so as to ultrasonically weld the two pieces together.
1 Assignment
0 Petitions
Accused Products
Abstract
A process is provided for ultrasonically welding a rigid thermoplastic, such as acrylic, and a flexible thermoplastic, such a polyvinyl chloride (PVC) doped with plasticizers. The rigid piece includes an energy director where the joint is to be located. The energy director includes first and second ridges running the length of the joint and a groove running between the first and second ridges. The energy director is placed against one side of the flexible piece, and an ultrasonic horn against the other side opposite the energy director. The two pieces are then welded together using standard ultrasonic technology. The shape of the energy director promotes the melting and flow of both pieces as they are being welded together.
-
Citations
18 Claims
-
1. A process for joining first and second pieces together, the second piece having first and second sides, the process comprising the following steps:
-
providing on the first piece an energy director comprising first and second ridges running substantially parallel to each other, and a groove running between the first and second ridges, wherein the first ridge has a first side adjacent the groove and a second side opposite the groove, wherein the first ridge'"'"'s first side is steeper than the first ridge'"'"'s second side; placing the energy director against the first side of the second piece; placing an ultrasonic horn against the second side of the second piece opposite the energy director; and applying vibrations to the horn so as to ultrasonically weld the two pieces together. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12)
-
-
13. A process for joining first and second pieces together, the second piece having first and second sides, the process comprising the following steps;
-
providing on the first piece an energy director comprising first and second ridges running substantially parallel to each other, and a groove running between the first and second ridges, wherein the energy director is located at the end of a wall, the wall having a side, and wherein the second ridge has a side opposite the groove that slopes all the way down to the side of the wall, wherein the energy director further includes a ledge adjacent the side of the first ridge opposite the groove, wherein the side of the second ridge opposite the groove slopes down to a point below the ledge; placing the energy director against the first side of the second piece; placing an ultrasonic horn against the second side of the second piece opposite the energy director; and applying vibrations to the horn so as to ultrasonically weld the two pieces together. - View Dependent Claims (14, 15, 16, 17, 18)
-
Specification