Scheduling for multi-task manufacturing equipment

  • US 5,402,350 A
  • Filed: 06/28/1991
  • Issued: 03/28/1995
  • Est. Priority Date: 06/28/1991
  • Status: Expired due to Term
First Claim
Patent Images

1. A method for scheduling jobs of a manufacturing facility having at least one multi-task workstation including a work queue having said jobs at different phases of manufacture and for different downstream workstations, comprising the steps ofpartitioning said jobs in a job queue of said multi-task workstation into job categories, such that each of said job categories represents said jobs at a comparable stage of said manufacture and for the same downstream workstation;

  • determining priority factors for each of said job categories, said priority factors representing a flow position of said job category and feedback from said downstream workstation corresponding to a current workload of said downstream workstation;

    determining a priority score for each of said categories in accordance with said priority factors; and

    selecting from each of said categories in accordance with said priority score, jobs to be processed by said multitask workstation.