×

Earth-fixed cell beam management for satellite communication system

  • US 5,408,237 A
  • Filed: 07/08/1993
  • Issued: 04/18/1995
  • Est. Priority Date: 11/08/1991
  • Status: Expired due to Term
First Claim
Patent Images

1. A method for allocating a plurality of beams (19) transmitted from and received at positions in Earth orbit for communicating with a plurality of portable (P), mobile (M) and fixed (F) terminals and gateways (G) comprising the steps of:

  • forming a plurality of footprints (16) using a plurality of electronically steered, antenna elements (13a, 13b and 13c) which generate said plurality of beams (19);

    said plurality of antenna elements (13a, 13b and 13c) being carried onboard a plurality of satellites (12) flying in orbits (11) below geosynchronous altitude;

    one of said plurality of satellites (12) including a first serving satellite (12a) and a second satellite (12b) positioned next to said first serving satellite (12a);

    said plurality of footprints (16) illuminating portions of an Earth-fixed grid (20) with said plurality of beams (19);

    said plurality of beams (19) being capable of conveying a plurality of packets (Pk);

    said Earth-fixed grid (20) defining a plurality of Earth-fixed supercells (24);

    said plurality of Earth-fixed supercells (24) including a plurality of Earth-fixed cells (26);

    said plurality of Earth-fixed cells (26) including a target Earth-fixed cell (26t);

    tracking a target Earth-fixed cell (26t) by using a sequence of individual antenna elements (13a, 13b, 13c) aboard said first serving satellite (12a) so that said plurality of beams (19) are maintained over said target Earth-fixed cell (26t) as long as one of said plurality of individual antenna elements (13a, 13b, 13c) aboard said first serving satellite (12a) is capable of serving said target Earth-fixed cell (26t);

    measuring the distance from said first serving satellite (12a) which is currently serving said target Earth-fixed cell (26t) to the centroid of said target Earth-fixed cell (26t);

    measuring the distance from said second satellite (12b) which is the next closest satellite to said target Earth-fixed cell (26t) compared to said first serving satellite (12a) to the centroid of said target Earth-fixed cell (26t); and

    switching responsibility for providing said plurality of beams (19) to said target Earth-fixed cell (26t)from said first serving satellite (12a) to said second next satellite (12b)when the distance from said second next satellite (12b) to the centroid of said target Earth-fixed cell (26t) is less thanthe distance from said first serving satellite (12a) to the centroid of said target Earth-fixed cell (26t).

View all claims
  • 5 Assignments
Timeline View
Assignment View
    ×
    ×