×

Method and apparatus for adaptive demand limiting electric consumption through load shedding

  • US 5,414,640 A
  • Filed: 02/23/1994
  • Issued: 05/09/1995
  • Est. Priority Date: 07/05/1991
  • Status: Expired due to Term
First Claim
Patent Images

1. An apparatus for controlling aggregate electrical load of an electrical system to a load level below a predetermined target level, the apparatus comprising:

  • a sensor means for sensing said aggregate electrical load and generating load information representative of said aggregate electrical load;

    a memory means for storing information; and

    a processor means for executing a predetermined program;

    said processor means, said memory means, and said sensor means being operatively interconnected;

    said processor means effecting storage of said load information in said memory means;

    said processor means including a predictor means for forecasting a predicted load to be shed for a predetermined future period to keep said load level below said target level, said processor means issuing shed control signals to selected devices within said electrical system to shed appropriate devices of said selected devices in accordance with said predicted load to be shed, said processor means effecting storage of shed information indicative of the amount of electrical load being shed, said predictor means providing a forecast of energy requirements for said predetermined future period in accordance with said load information and said shed information, said predictor means further providing a maximum forecast of energy requirements for said predetermined future time period in accordance with an error factor and said forecast of energy requirements, said processor means calculating said predicted load to be shed in accordance with said maximum forecast of energy requirements, wherein said error factor is calculated from differences between said forecast of energy requirements for said predetermined future period made during a previous time period and a sum of said load information and said shed information during said previous time period.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×