Apparatus and method for controlling and scheduling processing machines
First Claim
Patent Images
1. A method for generating a schedule for a plurality of lots of a factory;
- comprising the steps of;
selecting a predetermined period of time for evaluating a plurality of process resources and said plurality of lots to be processed by said plurality of process resources;
selecting, from said plurality of process resources, a plurality of selected process resources available to process said lots during said predetermined period of time;
selecting, from said plurality of lots, a plurality of selected lots available to be processed by said selected process resources during said predetermined period of time;
determining a process resource score for each of combinations of selected process resources and selected lots;
determining a lot score for each of said combinations of said selected process resources and said selected lots;
combining said lot score and said process resource score for each of said combinations to determine a combination score for each of said combinations of selected process resources and said selected lots;
determining a winning score by comparing each of combination scores for each of said combination of selected process resources and said selected lots;
controlling the process resources within the factory to process the lots in accordance with the winning score.
1 Assignment
0 Petitions
Accused Products
Abstract
A method and apparatus selects a period of time for evaluating process resources and lots to be processed by the process resources. Selected lots and selected process resource are chosen that are available to be processed by the process resource and that are available to process the selected lots respectively. For each of the combination of selected process and selected lots a tool score and a lot score is determine and combined in order to select a winning score. The factory is controlled through the process resource in accordance with the winning score.
-
Citations
18 Claims
-
1. A method for generating a schedule for a plurality of lots of a factory;
-
comprising the steps of; selecting a predetermined period of time for evaluating a plurality of process resources and said plurality of lots to be processed by said plurality of process resources; selecting, from said plurality of process resources, a plurality of selected process resources available to process said lots during said predetermined period of time; selecting, from said plurality of lots, a plurality of selected lots available to be processed by said selected process resources during said predetermined period of time; determining a process resource score for each of combinations of selected process resources and selected lots; determining a lot score for each of said combinations of said selected process resources and said selected lots; combining said lot score and said process resource score for each of said combinations to determine a combination score for each of said combinations of selected process resources and said selected lots; determining a winning score by comparing each of combination scores for each of said combination of selected process resources and said selected lots; controlling the process resources within the factory to process the lots in accordance with the winning score. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9)
-
-
10. An apparatus for generating a schedule for a plurality of lots of a factory, comprising:
-
means for selecting a predetermining period of time for evaluating a plurality of process resources and said plurality of lots to be processed by said plurality of process resources; means for selecting, from said plurality of process resources, a plurality of selected process resources available to process said lots during said predetermined period of time; means for selecting, from said plurality of lots, a plurality of selected lots available to be processed by said selected process resources during said predetermined period of time; means for determining a process resource score for each of combinations of said selected process resources and said selected lots; means for determining a lot score for each of said combinations of selected process resources and said selected lots; means for combining said lot score and said process resource score for each of said combinations to determine a combined score for each of said combinations of selected process resources and said selected lots; and means for determining a winning score by comparing each of said combined score for each of said combination of selected process resource and said selected lots; a controller to control said process resources within the factory to process the lots in accordance with the winning score. - View Dependent Claims (11, 12, 13, 14, 15, 16, 17, 18)
-
Specification