×

Flexible method for building a recipe in a process control system

  • US 5,499,188 A
  • Filed: 08/22/1994
  • Issued: 03/12/1996
  • Est. Priority Date: 12/14/1992
  • Status: Expired due to Term
First Claim
Patent Images

1. In a process plant having a process control system and at least one production line, each production line having equipment with a predetermined equipment configuration, the process control system further including a controller for interfacing to each production line, the process control system having information pertaining to the equipment configuration of each production line stored in an equipment data base, the operations performed by each production line stored in an operations data base, and raw materials information of the process plant stored in a raw materials data base, a method for controlling the production of a product by a production line comprising the steps of:

  • a) based on the product to be produced, building a formula from formula data, the formula data providing information relating to relative quantities of raw materials included in the product, the order of combining the raw materials, and the process operations, the formula providing a sequence of operations for combining the raw materials compatible with production line operations and consistent with the formula data, the formula being independent of equipment;

    b) based on the formula and a selected production line, building a recipe for the product in accordance with a predetermined set of rules to perform a merging of the formula and equipment of the selected production line, wherein the predetermined set of rules comprises the steps of;

    i) fetching the formula information, equipment information, raw material information, and operations information from the respective data bases, to store the fetched information in a single data structure;

    ii) identifying a material feed group to identify first predetermined steps of the recipe, said first predetermined steps including a START step, necessary to be inserted into the recipe being built;

    iii) examining each START step within the recipe to determine if the START step should be made conditional;

    iv) sorting each step of the recipe resulting from step (iii) above according to a vessel of the equipment configuration associated with the step;

    v) inserting an initiate gauge fill step into the recipe prior to a gauge tank step; and

    vi) calculating parameters associated with second predetermined steps of said recipe;

    the recipe being a set of steps unique to the selected production line, and further wherein the set of steps is ordered to conform to the capabilities of the equipment configuration of the selected production line, necessary to produce the product; and

    c) executing the recipe by the controller, the controller causing the equipment of the production line to perform the specified operations in the specified sequence as called for in each step of the recipe to geneate the product.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×