×

Continuous multi-component slurrying process at oil or gas well

  • US 5,522,459 A
  • Filed: 06/03/1993
  • Issued: 06/04/1996
  • Est. Priority Date: 06/03/1993
  • Status: Expired due to Fees
First Claim
Patent Images

1. A process for continuously mixing a settable mud at an oil or gas well, comprising:

  • (a) flowing a dilution fluid directly into a mixing unit at the oil or gas well;

    (b) concurrently with said step (a) but in a separate stream from the dilution fluid, flowing a drilling fluid directly into the mixing unit;

    (c) concurrently with said steps (a) and (b) but in a separate stream from the dilution fluid and the drilling fluid, flowing a cementitious substance directly into the mixing unit; and

    (d) mixing the dilution fluid, the drilling fluid and the cementitious substance in the mixing unit.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×