Allocation method for generating a production schedule
First Claim
Patent Images
1. An allocation method for utilization within a computer for generating a feasible production schedule in response to a specified requirement q, the method comprising the computer implemented steps of:
- (1) determining what quantity (r) of a product can be produced with a specified quantity of supply components;
(2) allocating a required quantity of supply components for filling a thus defined partial order; and
(3) filling a remainder of the requirement (q-r) at some later time;
wherein the steps (1) and (2) and (3) are quantitatively determined by simultaneously solving within the computer a material balance constraint (MBC) inequality and a capacity availability constraint (CAC) inequality, wherein(i) the MBC comprises a step of comparinga) a quantity of product for external requirement (over an arbitrary time period) plus a total usage of parts in a production of other parts (over the same arbitrary time period), withb) a total external availability of parts (over the arbitrary period) plus a total production of parts lover the arbitrary period); and
(ii) the CAC comprises a step of comparinga) a total quantity of resource (used in the arbitrary time period) withb) an availability of resource (in the arbitrary time period);
so that if there is not sufficient capacity or material available to meet every requirement, the solution allocates available resources in favor of requirements with high priority.
1 Assignment
0 Petitions
Accused Products
Abstract
A novel allocation method for generating a feasible production schedule. The method, in response to a specified requirement q, comprises the steps of determining what quantity (r) of a product can be produced with a specified quantity of supply components; allocating a required quantity of supply components for filling a thus defined partial order; and filling a remainder of the requirement (q-r) at some later time.
-
Citations
12 Claims
-
1. An allocation method for utilization within a computer for generating a feasible production schedule in response to a specified requirement q, the method comprising the computer implemented steps of:
-
(1) determining what quantity (r) of a product can be produced with a specified quantity of supply components; (2) allocating a required quantity of supply components for filling a thus defined partial order; and (3) filling a remainder of the requirement (q-r) at some later time;
wherein the steps (1) and (2) and (3) are quantitatively determined by simultaneously solving within the computer a material balance constraint (MBC) inequality and a capacity availability constraint (CAC) inequality, wherein(i) the MBC comprises a step of comparing a) a quantity of product for external requirement (over an arbitrary time period) plus a total usage of parts in a production of other parts (over the same arbitrary time period), with b) a total external availability of parts (over the arbitrary period) plus a total production of parts lover the arbitrary period); and (ii) the CAC comprises a step of comparing a) a total quantity of resource (used in the arbitrary time period) with b) an availability of resource (in the arbitrary time period); so that if there is not sufficient capacity or material available to meet every requirement, the solution allocates available resources in favor of requirements with high priority. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12)
-
Specification