×

Early evaluation by fall-off testing

  • US 5,555,945 A
  • Filed: 08/15/1994
  • Issued: 09/17/1996
  • Est. Priority Date: 08/15/1994
  • Status: Expired due to Term
First Claim
Patent Images

1. A method of testing a zone of interest in subsurface formation intersected by a well, comprising:

  • (a) providing a column of fluid in said well, said column of fluid having an overbalanced hydrostatic pressure at said subsurface formation greater than a formation pressure of said subsurface formation;

    (b) running a testing string into said well, said testing string including a packer, a pressure monitor and a closure tool arranged to close a bore of said testing string;

    (c) shutting in said subsurface formation by setting said packer and closing said bore of said testing string with said closure tool and thereby initially trapping said overbalanced hydrostatic pressure of said column of fluid in said well below said packer; and

    (d) after step (c), monitoring a pressure fall-off in said well below said packer.

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×