×

Apparatus and method for controlling an electrical load and monitoring control operations and the electrical load

DC
  • US 5,576,700 A
  • Filed: 08/26/1992
  • Issued: 11/19/1996
  • Est. Priority Date: 08/26/1992
  • Status: Expired due to Term
First Claim
Patent Images

1. In an electrical load management system, said system including a plurality of an improved load control switching and monitoring apparatus, each of said improved apparatus located proximate to an electrical load to be controlled, and a data processing center remotely located and separated from said electrical load, for causing electrical load reductions in an electrical distribution network and monitoring each of said electrical load reductions and energy supplied to said electrical load, said apparatus comprising:

  • control means for controlling said electrical load in said electrical distribution network in response to command signals transmitted by a command center, said command center remotely located from said electrical load;

    first monitoring means for generating electrical load data in response to detecting the distribution and interruption of said energy to said electrical load;

    second monitoring means for generating electrical load control data in response to detecting the control operation of said control means; and

    data collection means for collecting said electrical load data and said electrical load control data and communicating said electrical load data and said electrical load control data to said data processing center, said data processing center operative to process said electrical load data and said electrical load control data to determine the effectiveness of said electrical load management system.

View all claims
  • 18 Assignments
Timeline View
Assignment View
    ×
    ×