×

Method and apparatus for the offshore installation of multi-ton prefabricated deck packages on partially submerged offshore jacket foundations

  • US 5,607,260 A
  • Filed: 07/12/1995
  • Issued: 03/04/1997
  • Est. Priority Date: 03/15/1995
  • Status: Expired due to Term
First Claim
Patent Images

1. A lifting apparatus for placing a multi-ton deck package on an offshore jacket foundation, comprising:

  • a) a pair of barges, each barge having a base that can support a large multi-ton load;

    b) the base comprising upper and lower base members and an articulation joint that joins the base members so that one base member can articulate relative to the other when an undersireable seastate exists;

    c) truss means supported by the base about the periphery of the deck package for forming a load transfer between the barges and the deck package to be placed, said truss means including a plurality of diagonally extending lift booms, each lift boom having a lower end attached to the upper base member and an upper free end;

    d) upper and lower connection means for forming attachments of the truss means to the deck package at upper and lower respective elevational positions;

    e) said upper and lower connection means including corresponding connecting portions that enable the barges and package to quick disconnect, one of said corresponding quick connecting portions including the upper free end portion of the lifting boom, said other quick connecting portion being positioned at said upper elevational position; and

    f) means for lowering the combination of the truss means and the supported deck package with respect to the jacket foundation during placement of the deck package on the jacket foundation.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×