Method for establishing the working mantime in the production line

  • US 5,615,138 A
  • Filed: 09/11/1995
  • Issued: 03/25/1997
  • Est. Priority Date: 04/08/1993
  • Status: Expired due to Fees
First Claim
Patent Images

1. A method of employing a plurality of working means, said method comprising the steps of:

  • operating a production line by performing a plurality of production processes according to a first schedule, said production processes being performed by said working means;

    determining first working mantimes for said working means for said first schedule, said step of determining said first working mantimes including the step of evaluating work volumes of said production processes performed by said working means;

    establishing fatigue recovery mantimes for said working means, said step of establishing said fatigue recovery mantimes including the step of evaluating the fatigue extents of said production processes;

    determining a modified schedule for said production line based on said first working mantimes and said fatigue recovery mantimes; and

    operating said production line according to said modified schedule, said modified schedule being different than said first schedule, said step of operating said production line according to said modified schedule being performed by said working means, and wherein the steps performed by said working means during said step of operating said production line according to said modified schedule are different than the steps performed by said working means during said step of operating said production line according to said first schedule.