Pipeline padding machine with crusher
First Claim
1. A pipeline padding system for processing at least a portion of the excavated material into a final processed padding material, the excavated material positioned along the side of a ditch in which a pipeline has been laid, the system having:
- a pipeline padding machine, including;
a means for engaging the excavated material and elevating a portion of said excavated material to a first position located on said machine;
a separator for separating the elevated excavated material into a coarse portion and a padding portion, said coarse portion deposited away from the open ditch;
a crusher assembly mounted on said padding machine for receiving substantially all of said padding portion of said elevated excavated material and crushing said padding portion into said final processed padding material having a maximum predetermined size without further processing of said final processed padding material.
1 Assignment
0 Petitions
Accused Products
Abstract
A pipeline padding machine is provided comprising a crushing mechanism for crushing large pieces of excavated material into smaller pieces of material that are suitable for use in padding a pipeline or underground cable. In preferred embodiments, the crusher comprises two parallel rollers that are arranged with a selected gap between them. The rollers are driven toward each other, such that excavated material that is fed onto the rollers is drawn into the gap, and pieces that are too large to fall through the gap are crushed by the rollers. The crusher mechanism may be installed on a known type of padding machine, preferably at the end of the transverse conveyor over the trench. Alternatively, the crusher may be mounted on the padding machine frame. The output material from the crusher may be screened or otherwise processed, or it may be delivered directly to the trench.
50 Citations
10 Claims
-
1. A pipeline padding system for processing at least a portion of the excavated material into a final processed padding material, the excavated material positioned along the side of a ditch in which a pipeline has been laid, the system having:
-
a pipeline padding machine, including; a means for engaging the excavated material and elevating a portion of said excavated material to a first position located on said machine; a separator for separating the elevated excavated material into a coarse portion and a padding portion, said coarse portion deposited away from the open ditch; a crusher assembly mounted on said padding machine for receiving substantially all of said padding portion of said elevated excavated material and crushing said padding portion into said final processed padding material having a maximum predetermined size without further processing of said final processed padding material. - View Dependent Claims (2, 3)
-
-
4. A pipeline padding system for processing at least a portion of the excavated material into a final processed padding material, the excavated material positioned along the side of an open ditch in which a pipeline has been laid, the system having:
-
a pipeline padding machine, including; a means for engaging the excavated material and elevating a portion of said excavated material to a first position located on said machine; a separator for receiving and separating the elevated excavated material into a coarse portion and a padding portion, said coarse portion deposited away from the open ditch; a crusher assembly mounted on said padding machine for receiving at least a portion of said padding portion of said elevated excavated material and crushing said at least a portion of said padding portion into said final processed padding material having a maximum predetermined size, said crusher assembly having a pair of crushing rollers that are spaced from one another, the rollers rotatable about their longitudinal axis toward one another such that the material which is received by the crusher assembly is dram between the rollers and crushed, said final processed padding material being deposited into said open ditch about the pipeline without further processing. - View Dependent Claims (5, 6, 7)
-
-
8. A pipeline padding system for processing at least a portion of the excavated material into a final processed padding material, the excavated material positioned along the side of an open ditch in which a pipeline has been laid, the system comprising:
-
a pipeline padding machine having; a means for receiving a portion of said excavated material at a first position located on said machine; a separator for separating the received excavated material into a coarse portion and a padding portion, said coarse portion deposited away from the open ditch; a crusher assembly mounted on said padding machine for receiving at least a portion of said padding portion of said received excavated material and crushing said at least a portion of said padding portion into said final processed padding material having a maximum predetermined size without further processing of said final processed padding material. - View Dependent Claims (9, 10)
-
Specification