×

Geographic train control

  • US 5,751,569 A
  • Filed: 03/15/1996
  • Issued: 05/12/1998
  • Est. Priority Date: 03/15/1996
  • Status: Expired due to Term
First Claim
Patent Images

1. A method of controlling railroad train movement over a geographically defined network of geographic control objects which represent a layout of railroad track which includes signals, switches and track blocks, each signal having signal control hardware and software logic, which logic includes an address, representation of signal condition, and means for initiating a change in signal condition (signal object logic), each switch having switch control hardware and software logic, which logic includes an address, representation of switch condition, and means for initiating a change in switch condition (switch object logic), each track block having hardware and software logic, which logic includes an address and representation of track block occupancy condition (track object logic), each object logic including the addresses of only its next adjacent neighboring objects,the method including the steps of establishing communication between each signal object logic, switch object logic, and track object logic and only its next adjacent object'"'"'s logic regardless whether it be signal object logic, switch object logic, or track object logic, with such communication being one of a plurality of predetermined messages, which messages either request a response relative to train movement, or provide a response relating to train movement.

View all claims
  • 8 Assignments
Timeline View
Assignment View
    ×
    ×