Geographic train control
First Claim
1. A method of controlling railroad train movement over a geographically defined network of geographic control objects which represent a layout of railroad track which includes signals, switches and track blocks, each signal having signal control hardware and software logic, which logic includes an address, representation of signal condition, and means for initiating a change in signal condition (signal object logic), each switch having switch control hardware and software logic, which logic includes an address, representation of switch condition, and means for initiating a change in switch condition (switch object logic), each track block having hardware and software logic, which logic includes an address and representation of track block occupancy condition (track object logic), each object logic including the addresses of only its next adjacent neighboring objects,the method including the steps of establishing communication between each signal object logic, switch object logic, and track object logic and only its next adjacent object'"'"'s logic regardless whether it be signal object logic, switch object logic, or track object logic, with such communication being one of a plurality of predetermined messages, which messages either request a response relative to train movement, or provide a response relating to train movement.
8 Assignments
0 Petitions
Accused Products
Abstract
The invention relates to a method of controlling railroad train movement over a layout of railroad track that is defined geographically using a linear network of geographic control objects which includes signals, switches and track blocks. Each signal has signal control hardware and software logic, which logic includes an address, representation of signal condition, and the ability to initiate a change in signal condition. Each switch has switch control hardware and software logic, which logic includes an address, representation of switch condition, and the ability to initiate a change in switch condition. Each track block has hardware and software logic, which logic includes an address and a representation of track block occupancy condition. The method is specifically directed to establishing communication between each signal logic, switch logic, and track logic, and only its next adjacent logic neighbors regardless of whether it be signal logic, switch logic, or track logic. Such communication is limited to one of a plurality of predetermined messages, which messages either request a response relating to train movement or provide a response relating to train movement.
85 Citations
7 Claims
-
1. A method of controlling railroad train movement over a geographically defined network of geographic control objects which represent a layout of railroad track which includes signals, switches and track blocks, each signal having signal control hardware and software logic, which logic includes an address, representation of signal condition, and means for initiating a change in signal condition (signal object logic), each switch having switch control hardware and software logic, which logic includes an address, representation of switch condition, and means for initiating a change in switch condition (switch object logic), each track block having hardware and software logic, which logic includes an address and representation of track block occupancy condition (track object logic), each object logic including the addresses of only its next adjacent neighboring objects,
the method including the steps of establishing communication between each signal object logic, switch object logic, and track object logic and only its next adjacent object'"'"'s logic regardless whether it be signal object logic, switch object logic, or track object logic, with such communication being one of a plurality of predetermined messages, which messages either request a response relative to train movement, or provide a response relating to train movement.
Specification