×

Automated system and method for optimizing and palletizing articles

  • US 5,844,807 A
  • Filed: 11/09/1995
  • Issued: 12/01/1998
  • Est. Priority Date: 11/09/1995
  • Status: Expired due to Fees
First Claim
Patent Images

1. A computer implemented palletizing system for optimizing an arrangement of articles into tiers, and the tiers into at least one unit for shipping on a pallet comprising:

  • a computer programmed to receive an article size, a total number of articles desired, and a selected pallet type to arrange the articles into horizontal tiers, the computer further programmed to generate a plurality of possible tier configurations each having base dimensions substantially equal to the base dimensions of the selected pallet type, and thereafter vertically stacking selected tier configurations to form a rectangular-shaped unit configuration;

    a computer monitor connected to the computer for displaying the possible tier configurations and the unit configuration;

    input means for an operator to enter a length and width of an article and a total number of articles desired, and wherein the computer monitor has an input means to select a standard pallet type, and wherein the computer generates possible tier configurations based upon the length and width of the article, the total number of articles desired, and the pallet type selected;

    said computer further including means for generating rotated rows of articles and unrotated rows of articles and providing spacing between selected articles within the rows when necessary to cause the length of a row to substantially equal the length of the selected pallet type; and

    ,a palletizer connected to the computer for building at least one unit of articles consistent with the unit configuration, the palletizer comprising a stack forming station in which tiers of articles are sequentially deposited, a tier forming station in which tiers of articles are formed from individually formed rows of articles, and a transfer device for moving the formed tiers to the stack forming station.

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×