×

Monitoring of internal partial discharges in a power transformer

  • US 5,903,158 A
  • Filed: 12/06/1996
  • Issued: 05/11/1999
  • Est. Priority Date: 05/02/1995
  • Status: Expired due to Term
First Claim
Patent Images

1. A method for monitoring partial discharges in an electric power transformer under normal operating conditions, comprising:

  • sensing a magnetic field at a high-voltage bushing on the power transformer with an inductive sensor that includes at least one coil arranged at the bushing;

    sensing an electric field at the high-voltage bushing with a capacitive sensor;

    supplying output signals from the inductive sensor and the capacitive sensor to a signal processing unit in which each output signal is filtered in a separate bandpass filter;

    multiplying the filtered output signals by each other;

    forming with the signal processing unit a PDI output signal corresponding to the amount of internal partial discharge in the transformer in dependence on the result of the multiplication to detect internal partial discharges in the transformer.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×