Method for part procurement in a production system with constrained resources

  • US 5,970,465 A
  • Filed: 06/04/1997
  • Issued: 10/19/1999
  • Est. Priority Date: 10/05/1994
  • Status: Expired due to Fees
First Claim
Patent Images

1. A computer implemented process for determining procurement level for parts (P) in a production system having constraints comprising at least one of constrained resources (r) and known maximum demands dj, comprising:

  • 1) inputting to the computer, data including decision variables, production quantity, demand quantity, bill of material, bill of capacity and usage rate;

    2) constructing in computer memory a production planning decision space consisting of independent sets of hyperplanes defined by decision variables qj,t corresponding to production quantities for products (j), said constructing including the steps of;

    a) expressing a potential usage of part (p) as a linear combination of production quantities (qj);

    b) limiting the production quantities (qj) so that it is less than or equal to the maximum demand quantity (dj);

    andc) limiting the production quantities (qj) so that the usage of each other resource (r) based on multiple level bill of material and bill of capacity usage rates is less than or equal to the availability of that resource;

    3) locating a region in the decision space corresponding to a high level of usage of part (p);

    and4) interactively displaying to a user candidate values in said decision space corresponding to the highest level of usage of part (p) so assist the user in deciding quantities of part (p) to procure necessary to enable achievement of the highest level of service, corresponding to the highest level of usage of part (p), while maintaining the lowest possible WIP and inventory on the basis of linear demand, resource, and supply constraining information.