×

Integrated circuit design automatic utility meter: apparatus & method

  • US 5,994,892 A
  • Filed: 07/31/1996
  • Issued: 11/30/1999
  • Est. Priority Date: 07/31/1996
  • Status: Expired due to Fees
First Claim
Patent Images

1. An automatic utility meter, comprising:

  • (a) an internal power supply circuit, said internal power supply circuit having an input, said internal power supply circuit having an output for powering internal components in said utility meter;

    (b) a voltage transducer, said voltage transducer having an input for connection across first and second external power supply lines, said voltage transducer having a first output operatively coupled to said input of said internal power supply circuit, said voltage transducer having a second output for providing a first voltage signal;

    (c) a first current transducer configured for sensing current flow through said first power supply line and outputting a second voltage signal proportional to current flowing through said first power supply line;

    (d) a second current transducer configured for sensing current flow through said second power supply line and outputting a third voltage signal proportional to current flowing through said second power supply line;

    (e) sampling means for sampling said first, second and third voltage signals;

    (f) processing means for processing said sampled voltage signals, and for processing encoded signals from a utility supply meter such as a gas or water meter; and

    (g) a communications interface operatively coupled to said processing means for transferring data between said processing means and an external computer.

View all claims
  • 8 Assignments
Timeline View
Assignment View
    ×
    ×