×

Dynamic schedule profiler for ACD

  • US 6,005,932 A
  • Filed: 12/24/1997
  • Issued: 12/21/1999
  • Est. Priority Date: 12/24/1997
  • Status: Expired due to Term
First Claim
Patent Images

1. A method of scheduling agents supporting operation of an ACD, such method comprising the steps of:

  • establishing a scheduling period;

    identifying a plurality of agents to the ACD for supporting the operation of the ACD during the scheduling period;

    applying a generally periodic deviation schedule of an agent of the plurality of agents to the scheduling period which generally periodic deviation schedule is periodic over a plurality of days of the scheduling period.

View all claims
  • 17 Assignments
Timeline View
Assignment View
    ×
    ×