×

Methods and structures for pad reconfiguration to allow intermediate testing during manufacture of an integrated circuit

  • US 6,068,892 A
  • Filed: 05/13/1999
  • Issued: 05/30/2000
  • Est. Priority Date: 09/12/1997
  • Status: Expired due to Term
First Claim
Patent Images

1. An integrated circuit, the integrated circuit including a first subcircuit which is fully processed at an intermediate stage during the processing of the integrated circuit and a second subcircuit which is partially processed at said intermediate stage, comprising a plurality of intermediate probe pads for transmitting signals from said tester to the subcircuit to test the subcircuit at the intermediate stage of processing.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×