×

Segmented brake pipe train control system and related methods

  • US 6,095,618 A
  • Filed: 03/19/1999
  • Issued: 08/01/2000
  • Est. Priority Date: 03/19/1998
  • Status: Expired due to Term
First Claim
Patent Images

1. A train control system for a train comprising at least first and second train segments including a brake pipe being separated between adjacent train segments, the train control system comprising:

  • a first control subsystem for installation in a locomotive of the first train segment and a second control subsystem for installation in a locomotive of the second train segment, the first and second control subsystems communicating with one another for controlling train braking; and

    a third control subsystem for installation in a railcar adjacent an end of the first train segment and comprisingat least one pressure transducer for sensing brake pipe pressure adjacent the end of the first train segment,at least one control valve for controlling brake pipe pressure adjacent the end of the first train segment, anda processor for communicating a signal related to brake pipe pressure adjacent the end of the first train segment to the second control subsystem, and for controlling brake pipe pressure adjacent the end of the first train segment responsive to a command from the second control subsystem.

View all claims
  • 4 Assignments
Timeline View
Assignment View
    ×
    ×