Pretrip device for testing of a refrigeration system compressor
First Claim
1. A method for testing a compressor of the type having at least one unloader, a first cylinder bank, and a second cylinder bank, said method comprising the steps of:
- measuring a first pressure differential indicator;
loading said first cylinder bank;
measuring a second pressure differential indicator subsequent to said first cylinder bank loading step;
unloading said first cylinder bank;
loading said second cylinder bank;
measuring a third pressure differential indicator subsequent to said second cylinder loading step; and
determining a location of a problem within said compressor based at least in part on at least two of said pressure differential indicators.
1 Assignment
0 Petitions
Accused Products
Abstract
A refrigeration/heating system for cooling or heating an area includes a condenser for removing heat from the system to an external environment, an evaporator for receiving heat from the area to be cooled or delivering heat to the area to be heated, and a compressor for raising the pressure and the temperature of a refrigerant. The compressor has at least one cylinder bank and an unloader connected to the cylinder bank for loading and unloading the cylinder bank. Pressure transducers measure the suction and discharge pressures of the compressor when the state of a cylinder bank is changed from a loaded to an unloaded state. A processor uses the suction and discharge pressures in the various states to determine the operational condition of either unloader. By varying the loading and unloading of a pair of cylinder banks, the processor can also use various suction and discharge pressures to determine if a problem exists within either cylinder bank or unloader.
67 Citations
23 Claims
-
1. A method for testing a compressor of the type having at least one unloader, a first cylinder bank, and a second cylinder bank, said method comprising the steps of:
-
measuring a first pressure differential indicator;
loading said first cylinder bank;
measuring a second pressure differential indicator subsequent to said first cylinder bank loading step;
unloading said first cylinder bank;
loading said second cylinder bank;
measuring a third pressure differential indicator subsequent to said second cylinder loading step; and
determining a location of a problem within said compressor based at least in part on at least two of said pressure differential indicators. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22)
-
-
12. A method for testing a compressor of the type having a front unloader, a rear unloader, a front cylinder bank and a rear cylinder bank, said method comprising the steps of:
-
measuring a first pressure differential indicator;
loading said rear cylinder bank;
measuring a second pressure differential indicator subsequent to said rear cylinder bank loading step;
unloading said rear cylinder bank; and
measuring a third pressure differential indicator subsequent to said rear cylinder bank unloading step;
loading said front cylinder bank;
measuring a fourth pressure differential indicator subsequent to said front cylinder loading step;
unloading said front cylinder bank;
measuring a fifth pressure differential indicator subsequent to said front cylinder unloading step; and
determining a location of a problem within said compressor based at least in part on at least two of said pressure differential indicators.
-
-
23. A refrigeration system comprising:
-
a compressor having a front unloader a rear unloader, a front cylinder bank, and a rear cylinder bank;
an evaporator;
a condenser for removing heat from said refrigeration system;
means for measuring a first pressure differential indicator of said system;
means for loading said rear cylinder bank;
means for measuring a second pressure differential indicator subsequent to said rear cylinder bank loading means loading said rear cylinder bank;
means for unloading said rear cylinder bank;
means for loading said front cylinder bank;
means for measuring a third pressure differential indicator subsequent to said front cylinder loading means loading said front cylinder bank; and
means for determining a location of a problem within said compressor by considering at least two of said pressure differential indicators.
-
Specification