×

System and method for a previously activated mobile station to challenge network mobile station knowledge during over the air activation

  • US 6,195,547 B1
  • Filed: 09/24/1998
  • Issued: 02/27/2001
  • Est. Priority Date: 09/24/1998
  • Status: Expired due to Term
First Claim
Patent Images

1. A method for activating over the air a previously activated mobile station in a wireless communications network having an over the air processor, the method comprising the steps of:

  • i) the over the air processor requesting the data configuration information of the mobile station;

    ii) the mobile station making a first challenge request of the request for data configuration information and transmitting certain mobile station parameters to the network;

    iii) the network in response to the first challenge request from the mobile station using the certain mobile station parameters to generate a first return challenge response and forwarding the first return challenge response to the mobile station;

    iv) the mobile station validating the first return challenge response and forwarding data configuration information to the over the air processor;

    v) the over the air processor sending new programming information to the mobile station to re-activate the mobile station with new operating parameters, wherein the over the air processor further requests the mobile station to commit to the new operating parameters;

    vi) the mobile station upon receipt of the request to commit to new operating parameters making a second challenge request to the network and transmitting certain mobile station parameters to the network;

    vii) the network in response to the second challenge request from the mobile station using the certain mobile station parameters to generate a second return challenge response and forwarding the second return challenge response to the mobile station; and

    viii) upon receipt of the second return challenge response the mobile station validating the second return challenge response and then committing to the new operating parameters.

View all claims
  • 6 Assignments
Timeline View
Assignment View
    ×
    ×