Concrete form
DCFirst Claim
1. A process for pouring and finishing a concrete slab having at least one peripheral edge and a predetermined thickness, the process comprising:
- a) providing one or more concrete forms in an arrangement defining a periphery of the slab, the form having a recessed top wall providing a support area for a temporary extended border portion of the slab having a thickness less than said predetermined thickness;
b) pouring the concrete within the area defined by the form to a height determined by an upper edge of the form, and so that the temporary extended border portion of the slab is supported on the recessed top wall;
c) surface finishing the concrete slab across the top surface thereof, extending outwardly at least to the innermost portion of the temporary extended border portion of the slab; and
d) after the concrete has hardened, removing the form along with the temporary extended border portion.
1 Assignment
Litigations
0 Petitions
Accused Products
Abstract
A process for pouring and finishing a concrete slab having a predetermined thickness. Concrete forms are arranged to define the periphery of the slab. Each form having a recessed top wall which serves to provide a support area for a temporary extended border portion of the slab with the border portion having a thickness less than the predetermined thickness of the slab. Concrete is poured within the area defined by the forms to a height determined by the upper edge of the form. The temporary extended border portion of the slab being supported by the recessed top wall. The concrete slab is surface finished across the top surface thereof, extending outwardly at least to the inner most portion of the temporary extended border portion of the slab. After the concrete has hardened, the forms are removed along with the temporary extended border portion as by cutting through the concrete along an inner vertical surface of the concrete forms.
48 Citations
2 Claims
-
1. A process for pouring and finishing a concrete slab having at least one peripheral edge and a predetermined thickness, the process comprising:
-
a) providing one or more concrete forms in an arrangement defining a periphery of the slab, the form having a recessed top wall providing a support area for a temporary extended border portion of the slab having a thickness less than said predetermined thickness;
b) pouring the concrete within the area defined by the form to a height determined by an upper edge of the form, and so that the temporary extended border portion of the slab is supported on the recessed top wall;
c) surface finishing the concrete slab across the top surface thereof, extending outwardly at least to the innermost portion of the temporary extended border portion of the slab; and
d) after the concrete has hardened, removing the form along with the temporary extended border portion. - View Dependent Claims (2)
-