Bridge platform

  • US 6,227,331 B1
  • Filed: 12/21/1999
  • Issued: 05/08/2001
  • Est. Priority Date: 08/18/1997
  • Status: Expired due to Term
First Claim
Patent Images

1. A method for installing a platform below the deck of a bridge for supporting persons performing work on the bridge and for collecting debris resulting from the work, said method comprising the steps of:

  • a) providing a plurality of cables;

    b) providing a pair of assemblies each having components for installation on a bridge structure;

    c) installing said pair of assemblies on a corresponding pair of spaced-apart bridge structures at locations below the deck of the bridge;

    d) connecting said cables to said assemblies so as to secure the cables to the bridge so that they extend along the bridge and in spaced relation to each other and in a plane substantially parallel to the deck at a distance below the portion of the bridge upon which work is to be performed;

    e) providing a plurality of flooring sections each comprising corrugated elongated rectangular decking panels wherein the corrugations extend along the length of the panel and each flooring section having at least one opening therein;

    f) placing the flooring sections on the cables with the corrugations extending transversely of the cables and with the sections in end-to-end and side-to-side contacting relation to each other; and

    g) fastening the flooring section to the cables by means of releasable connector assemblies each engaging the flooring sections and a corresponding one of the cables by placing a first part of a connector assembly so that a portion thereof is in engagement with the upper surface of the flooring section and another portion thereof is in engagement with the cable through an opening in the flooring section, placing a second part of the connector assembly in engagement with the upper surface of the flooring section and releasably connecting the first and second parts together so that each individual flooring section can be removed to allow access through the flooring.

View all claims