Automated method for building a model
DCFirst Claim
1. A method for creating a representation of a plant and incorporating it into a run time prediction system for generating predicted output values representing the operating parameters of the plant during operation thereof, comprising the steps of:
- providing a historical database representing the operation of the plant and comprised of data associated with plant inputs and plant outputs;
extracting data from the historical database and creating a dataset of variables corresponding to the inputs and outputs from the historical database;
creating an off-line predictive model of the plant utilizing the created dataset to predict a plant output and defined by off-line model parameters;
creating an on-line model for generating predicted output values in real time during the operation the a plant and defined by on-line model parameters; and
replacing the on-line model parameters with the off-line model parameters after generation thereof.
13 Assignments
Litigations
0 Petitions
Accused Products
Abstract
A method for building a model of a system includes first extracting data from a historical database (310). Once the data is extracted, a dataset is then created, which dataset involves the steps of preprocessing the data. This dataset is then utilized to build a model. The model is defined as a plurality of transforms which can be utilized to run an on-line model. This on-line model is interfaced with the historical database such that the variable names associated therewith can be downloaded to the historical database. This historical database can then be interfaced with a control system to either directly operate the plant or to provide an operator an interface to various predicted data about the plant. The building operation will create the transform list and then a configuration step is performed in order to configure the model to interface with the historical database. When the dataset was extracted, it is unknown whether the variables names are still valid. It is therefore necessary to read and write the various variables to the database to determine if they are in fact valid. Further, the predicted output values, which may not have been a part of the historical database, need to be verified. Once these are verified, then the on-line model can be created to generate the predicted value for transfer to the control system. During this period of time, the control system must be disabled.
156 Citations
20 Claims
-
1. A method for creating a representation of a plant and incorporating it into a run time prediction system for generating predicted output values representing the operating parameters of the plant during operation thereof, comprising the steps of:
-
providing a historical database representing the operation of the plant and comprised of data associated with plant inputs and plant outputs;
extracting data from the historical database and creating a dataset of variables corresponding to the inputs and outputs from the historical database;
creating an off-line predictive model of the plant utilizing the created dataset to predict a plant output and defined by off-line model parameters;
creating an on-line model for generating predicted output values in real time during the operation the a plant and defined by on-line model parameters; and
replacing the on-line model parameters with the off-line model parameters after generation thereof. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13)
-
-
14. A method for assisting a user in creating a representation of a plant and incorporating it into a run time prediction system for generating predicted output values representing operating parameters of the plant during operation thereof, comprising the steps of:
-
providing a display;
providing a historical database;
displaying an extraction graphical assist device with associated interactive instructions to assist the user in extracting data from a historical database representing the operation of the plant and comprised of data associated with plant inputs and plant outputs, and creating a dataset of variables corresponding to the inputs and outputs from the historical database when the user has completed the instructions;
displaying a model building graphical assist device with associated interactive instructions to assist the user in creating an off-line predictive model of the plant utilizing the created dataset to predict a plant output and defined by off-line model parameters;
displaying a graphical assist device with associated interactive instructions to assist the user in replacing on-line model parameters of an on-line model with the off-line model parameters after generation thereof, which the on-line model is operable to generate predicted output values in real time during the operation the a plant and defined by the on-line model parameters. - View Dependent Claims (15, 16, 17, 18, 19, 20)
-
Specification