Focused formation fluid sampling probe
First Claim
1. A formation tester tool for retrieving a formation fluid from a formation surrounding a wellbore having a drilling fluid, comprising:
- (a) a first element adapted to retrieve the formation fluid from a first (probe) zone in the formation, the first element having a first controlled pressure; and
(b) an isolation device, said isolation device defining a second (guard) zone adjacent the probe zone said second guard zone being maintained at a second controlled pressure, the first and second pressures being varied such that the flow of drilling fluid into the probe zone is reduced; and
(c) a device for retrieving fluid from the guard zone.
2 Assignments
0 Petitions
Accused Products
Abstract
A formation fluid sampling probe uses two hydraulic lines to recover formation fluids from two zones in a borehole. One of the zones is a guard zone and the other is a probe zone. The guard zone and the probe zone are isolated from each other by mechanical means, with the guard zone surrounding the probe zone and shielding it from the direct access to the borehole fluids. Operation of the tool involves withdrawal of fluid from both zones. Borehole fluids are preferentially drawn into the guard zone so that the probe zone recovers the formation fluid substantially free of borehole fluids. Separation of the guard zone from the probe zone may be accomplished by means of an elastomeric guard ring, by inflatable packers or by tubing. The device can be adapted for use either on a wireline or in an early evaluation system on a drillstring.
322 Citations
47 Claims
-
1. A formation tester tool for retrieving a formation fluid from a formation surrounding a wellbore having a drilling fluid, comprising:
-
(a) a first element adapted to retrieve the formation fluid from a first (probe) zone in the formation, the first element having a first controlled pressure; and
(b) an isolation device, said isolation device defining a second (guard) zone adjacent the probe zone said second guard zone being maintained at a second controlled pressure, the first and second pressures being varied such that the flow of drilling fluid into the probe zone is reduced; and
(c) a device for retrieving fluid from the guard zone. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16)
a probe flow line connected to the probe zone;
a first fluid analysis device in the probe flow line; and
a second fluid analysis device in the guard flow line.
-
-
6. The formation tester tool of claim 1 wherein the first element comprises a pair of probe packers adapted to engage the walls of the borehole defining the probe zone therebetween and the isolation device comprises a pair of guard packers disposed about the pair of probe packers, said guard packers adapted to engage the walls of the borehole and define the guard zone between each of the probe packers and the adjacent guard packer.
-
7. The formation tester tool of claim 6 further comprising a probe flow line connected to the probe zone.
-
8. The formation tester tool of claim 7 wherein the tool is adapted to be used on a wireline.
-
9. The formation tester tool of claim 7 wherein the tool is adapted to be used on a drillstring.
-
10. The formation tester tool of claim 8, further comprising a first control device for controlling fluid flow into the probe flow line and a second control device for controlling fluid flow into the second line.
-
11. The formation tester tool of claim 10, wherein the first control device maintains a first pressure in the probe flow line and the second control device maintains a second pressure in the guard flow line, the second pressure being less than or equal to the first pressure.
-
12. The formation tester tool of claim 11, further comprising a first fluid analysis device in the probe flow line.
-
13. The formation tester tool of claim 1, wherein the first element comprises an inner snorkel tube adapted to penetrate the formation and the isolation device comprises an outer snorkel tube adapted to penetrate the formation.
-
14. The formation tester tool of claim 13 wherein the tool is adapted to be used on a drillstring.
-
15. The formation tester tool of claim 5, further comprising a probe fluid sample chamber connected to the probe flow line.
-
16. The formation tester tool of claim 15, wherein the formation fluid tester is adapted to be used on a wireline.
-
17. A method for retrieving a formation fluid from a formation surrounding a wellbore having a contaminating fluid, comprising:
-
conveying a formation tester into the wellbore, said formation tester defining a probe zone and a guard zone adjacent the formation;
controlling the pressures of the probe zone and guard zone such that the guard zone pressures is the same as or lower than the probe zone pressure; and
retrieving formation fluid from the probe zone. - View Dependent Claims (18, 19, 20, 21, 22, 23, 24, 25, 26)
(a) connecting a guard flow line to the guard zone;
(b) connecting a probe flow line to the probe zone.
-
-
19. The method of claim 17, further comprising:
-
(a) expanding a pair of guard packers on the formation tester to engage the walls of the borehole; and
(b) expanding a pair of probe packers on the formation tester to engage the walls of the borehole and defining the probe zone therebetween, the probe packers being disposed between the guard packers and defining the guard zone between each of the probe packers and the adjacent guard packer.
-
-
20. The method of claim 19 further comprising operating the formation tester on a wireline.
-
21. The method of claim 19 further comprising operating the formation tester on a drillstring drillstring.
-
22. The method of claim 19 further comprising:
-
(a) activating an inner tube on the formation tester to penetrate the formation to define the probe zone, and (b) activating an outer tube on the formation tester to penetrate the formation, to define the guard zone by the region between the first tube and the second tube.
-
-
23. The method of claim 17, further comprising:
-
retrieving fluid from the guard zone; and
comparing the probe zone fluid with the guard zone fluid.
-
-
24. The method of claim 23, further comprising:
-
determining when the probe zone fluid is substantially free of contaminating fluid; and
collecting probe zone fluid into a probe sample chamber.
-
-
25. The method of claim 24, further comprising discharging the guard zone fluid into the formation.
-
26. The method of claim 24, further comprising collecting the guard zone fluid into a guard sample chamber.
-
27. A method for retrieving a formation fluid from a formation surrounding a wellbore having a drilling fluid comprising:
-
conveying a formation tester into the wellbore, said formation tester defining a probe zone and a guard zone adjacent the formation;
operating the formation tester to retrieve fluid from the guard zone and reducing the flow of the drilling fluid into the probe zone; and
retrieving fluid from the probe zone;
connecting a guard flow line to the guard zone;
connecting a probe flow line to the probe zone; and
lowering the pressure in the guard flow line to below the pressure of the probe flow line. - View Dependent Claims (28)
-
-
29. A formation tester tool for retrieving a formation fluid from a formation surrounding a wellbore having a drilling fluid, comprising:
-
a probe adapted to retrieve the formation fluid from a first (probe) zone in the formation;
a probe flow line associated with the probe;
a guard ring, said guard ring defining a second (guard) zone adjacent the probe zone;
a guard flow line associated with the guard ring;
a first pump adapted to control pressure in the probe flow line; and
a second pump adapted to control pressure in the guard flow line. a device for retrieving fluid from the guard zone in order to reduce the flow of the drilling fluid into the probe zone. - View Dependent Claims (30, 31, 32)
-
-
33. A formation tester tool for retrieving a formation fluid from a formation surrounding a wellbore having a drilling fluid comprising:
-
a probe adapted to contact said the formation and retrieve the formation fluid from a first (probe) zone in the formation;
a guard ring, said guard ring defining a second (guard) zone adjacent the probe zone;
a guard flow line connected to the guard zone for retrieving fluid from the guard zone;
a probe flow line connected to the probe zone; and
a first control device for controlling fluid flow into the probe flow line and a second control device for controlling fluid flow into the guard flow line, wherein the first control device maintains a first pressure in the probe flow line and the second control device maintains a second pressure in the guard flow line, the first pressure being greater than or equal to the second pressure. - View Dependent Claims (34, 35, 36)
-
-
37. A formation tester tool for retrieving a formation fluid from a formation surrounding a wellbore having a drilling fluid, comprising:
-
a probe adapted to retrieve the formation fluid from a first (probe) zone in the formation;
a guard ring said guard ring defining a second (guard) zone adjacent the probe zone; and
a device for retrieving fluid from the guard zone in order to reduce the flow of the drilling fluid into the probe zone;
a probe flow line in fluid communication with the probe zone;
a first control device for controlling fluid flow into the probe flow line; and
a second control device for controlling fluid flow into the guard flow line;
wherein the first control device maintains a first pressure in the probe flow line and the second control device maintains a second pressure in the guard flow line, the first pressure being greater than or equal to the second pressure.
-
-
38. A fluid sampling tool for retrieving a first fluid from a first zone where an adjacent second zone has a second fluid, comprising:
-
a tool body having a first chamber the first chamber adapted to receive the first fluid;
a probe having a first portion for penetrating the first zone, the probe having a probe flow line in fluid communication with the first chamber;
the probe flow line having a first controlled flow rate; and
a guard ring circumferentially disposed around the probe, the guard including a guard flow line, the guard flow line having a second controlled flow rate the first and second controlled flow rates varied such that the flow of the second fluid into the first zone is reduced. - View Dependent Claims (39, 40, 41)
-
-
42. A formation tester tool for retrieving a formation fluid from a formation surrounding a wellbore having a drilling fluid, comprising:
-
(a) a first element adapted to retrieve the formation fluid from a first probe zone in the formation, the first element having a first controlled pressure; and
(b) an isolation device, said isolation device defining, a second zone adjacent the probe zone, the isolation device having a second controlled pressure the first pressure being greater than or equal to the second pressure, thereby creating a fluid retrieval condition where the flow of drilling fluid into the first probe zone is reduced; and
(c) a device for retrieving formation fluid from the second zone. - View Dependent Claims (43, 44, 45)
a probe flow line connected to the probe zone;
a first fluid analysis device in the probe flow line; and
a second fluid analysis device in the guard flow line.
-
-
46. A method for retrieving a formation fluid from a formation surrounding a wellbore having a contaminating fluid, comprising:
-
positioning a formation tester in the wellbore, said formation tester defining a probe zone and a guard zone adjacent the formation;
varying the pressure in the probe zone and guard zone such that the contaminating fluid is drawn from the formation into the guard zone, thereby creating a fluid retrieval condition where the flow of contaminating fluid into the probe zone is reduced; and
retrieving formation fluid from the probe zone. - View Dependent Claims (47)
-
Specification