×

System and process for reducing the flowing bottom hole pressure in a natural gas well

  • US 6,315,048 B1
  • Filed: 09/17/1999
  • Issued: 11/13/2001
  • Est. Priority Date: 09/17/1999
  • Status: Expired due to Fees
First Claim
Patent Images

1. For use in increasing a downhole to well head pressure differential of a natural gas well, a process comprising the steps of:

  • providing a discrete fluid flow path from a well head end of the well through a valve to an inlet of a separator;

    providing a discrete gas flow path from an outlet of the separator to an inlet of a compressor;

    operating the compressor to maintain near zero or below PSIG pressure at the separator inlet;

    opening the valve to reduce the pressure at the well head.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×