Process and equipment for optimizing production
First Claim
Patent Images
1. A fully automated system for monitoring operation on machine lines of interconnected logical systems, comprising three modules:
- a module for knowledge of machine interactions of any type, capable of having repercussions at the level of breakdowns, between elements under control;
a module for recognizing, for each breakdown, a primary breakdown, from information contained in the module for knowledge; and
a module for attributing down time to the primary breakdown and with the appropriate coefficients, for the primary breakdown and to the other elements under control which, as a result of the primary breakdown, have either triggered an alarm, or have necessarily been affected by one of the primary breakdown or a secondary breakdown, even though they have not generated alarms themselves.
0 Assignments
0 Petitions
Accused Products
Abstract
A process and equipment for optimizing production includes identifying the breakdown that is actually responsible for a shutdown on a machine production line, and hence of introducing this specific criterion into the process for handling malfunctions, at the level of a man-machine interface. Thus, the true cause of a given breakdown is determined, and it becomes possible to act on this primary cause, and not just on the secondary breakdowns generated downstream; therefore productivity control is improved considerably.
-
Citations
6 Claims
-
1. A fully automated system for monitoring operation on machine lines of interconnected logical systems, comprising three modules:
-
a module for knowledge of machine interactions of any type, capable of having repercussions at the level of breakdowns, between elements under control;
a module for recognizing, for each breakdown, a primary breakdown, from information contained in the module for knowledge; and
a module for attributing down time to the primary breakdown and with the appropriate coefficients, for the primary breakdown and to the other elements under control which, as a result of the primary breakdown, have either triggered an alarm, or have necessarily been affected by one of the primary breakdown or a secondary breakdown, even though they have not generated alarms themselves. - View Dependent Claims (2, 3, 4, 5)
-
-
6. A process for optimizing production, particularly in machine lines, comprising three steps:
-
(a) knowing machine interactions of any type, capable of having repercussions at the level of breakdowns, between elements under control;
(b) recognizing, for each breakdown, a primary breakdown, from information known in step (a); and
(c) attributing down time to the primary breakdown and, with the appropriate coefficients, for the primary breakdown and to the other elements under control which, as a result of the primary breakdown, have either triggered an alarm, or have necessarily been affected by one of the primary breakdown or a secondary breakdown, even though they have not generated alarms themselves.
-
Specification