×

Method for controlling a well in a subsea mudlift drilling system

  • US 6,474,422 B2
  • Filed: 12/06/2000
  • Issued: 11/05/2002
  • Est. Priority Date: 12/06/2000
  • Status: Expired due to Term
First Claim
Patent Images

1. A method for controlling a subsea well, the method comprising:

  • shutting at least one blowout preventer;

    opening at least one isolation line;

    circulating a formation fluid influx out of a well while an inlet pressure of a subsea mudlift pump is adjusted to maintain a drill pipe pressure at a substantially constant initial circulating pressure;

    pumping drilling mud with a kill mud weight from a water surface into the well;

    reducing the drill pipe pressure according to a preselected drill pipe pressure decline schedule until the kill mud weight drilling mud reaches a bottom of the well;

    maintaining the drill pipe pressure at a substantially constant final circulating pressure after the kill mud weight drilling mud reaches the bottom of the well by adjusting the inlet pressure of the subsea mudlift pump; and

    circulating the kill mud weight drilling mud from the bottom of the well to the water surface while maintaining the substantially constant final circulating pressure.

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×